Show all pagescontract is scheduled to be presented before Township of West Orange Governing Body for adoption of Resolution to approve award the contract as per Township of West Orange process. Per Township of West Orange process, Township of West Orange prepares a contract to be signed by authorized representatives of both Township of West Orange and the lowest responsible bidder after Township of West Orange receives a letter of concurrence of award from the NJDOT-BLA. A copy of the contract between Township of West Orange and the contractor must be submitted to NJDOT-BLA prior to the pre-construction meeting. For sub-contracts between the prime contractor and any sub-contractors the DC-18 – Sub- Contractor Agreement -must be submitted by the prime contractor to Township of West Orange at least 20 days before the anticipated start of work by the sub -contractor. DC-18’s must be submitted to NJDOT-BLA at least 10 days before the start of any anticipated work. NJDOT-BLA must approve the DC-18 before any sub-contracting work can be done. 4.3 Federal Agreement - Construction NJDOT-BLA will provide the Federal Project Agreement to Township of West Orange at the time of Construction Authorization (under seperate cover letter) Township of West Orange will provide the following to NJDOT-BLA: • Within 45 days of receiving the agreement, Township of West Orange will provide Four (4) original signed and sealed copies of the Agreement along with Four (4) signed/sealed Resolutions for execution by the NJDOT. NOTE: No reimburseable work can be performed until the project agreement is executed by the NJDOT. Township of West Orange understands that failure to follow all Federal requirements may result in the loss of Federal reimbursement. 5.0 Construction Project Management Title 23 CFR 635.105 specifies oversight requirements for locally administrated fe deral aid construction projects, which mandates a full-time employee to be in responsible charge of Federal- Aid construction projects. The RC may work in conjunction with a consulting company providing Construction Management and Construction Inspection Services outlined by the RFP as described in Section 2 of this document. In accordance with 23 CFR 635.105, a full-time Township of West Orange employee will be designated to be the “Responsible Charge” for each federally funded
as described in Section 2 of this document. In accordance with 23 CFR 635.105, a full-time Township of West Orange employee will be designated to be the “Responsible Charge” for each federally funded project. This protocol will be required and applied even when consultants are providing design/contract administration/ or other engineering services on the project. See Section 2 of this document for the duties of the RC/PM. 22 | P a g e
File revisions (1)
- Sep 29, 2026
1227a7e49ff07,987,641 bytes