Show all pagesreview changes to determine if the goal is to be revised or if changes to the CR-266 are required. 5.7 Field Orders (see Appendix E) The RC/PM will notify NJDOT-BLA, if during construction, an inherent job condition should arise, and said condition, if not immediately corrected or changed, would unduly delay the project completion. The Contractor will provide to the Resident Engineer and RC/PM a detailed cost proposal (materials, labor, equipment, overhead) for extra (new work). Upon approval by NJDOT-BLA, the Contractor will be instructed by Field Order to proceed with the work. Township of West Orange will use the negotiated cost to develop the formal change order and will submit the DC-173A along with backup documentation once approved and signed by Township of West Orange. Field Orders • The contractor shall immediately notify the Resident Engineering that there is a need for a Field Order. • The Resident Engineer shall set up a meeting in the field to include the Contractor and the RC/PM to discuss the needed change, potential cost impacts and potential changes to the Progress Schedule. • Once the change has been agreed upon by all parties, the Resident Engineer shall issue, after the meeting, a written description of the change using Township of West Orange field order form (Appendix E), including the reason for the immediate need for the change, impacts to the scope of work, changes to the contract time and the anticipated cost. • The RC/PM will evaluate the Field Order request and, if acceptable, immediately notify the NJDOT-BLA by e-mail. Upon written approval from NJDOT-BLA, the Resident Engineer shall then issue a verbal approval to the contractor. The contractor can then proceed with the Field Order. The Resident Engineer will immediately prepare a written approval of the Field Order after verbal approval is given. The Resident Engineer shall record and verify all work and quantities related to the Field Order and immediately notify the RC/PM if the estimated work for the change should differ significantly from what was discussed. If there are significant differences, RC/PM shall decide whether a revised field change order is required. • The RC/PM
should differ significantly from what was discussed. If there are significant differences, RC/PM shall decide whether a revised field change order is required. • The RC/PM will proceed with inclusion of the Field Order in a Change Order at the next available Township of West Orange Governing Body meeting and submit to NJDOT-BLA for formal approval by use of a Federal Aid Change Order (Form DC-173A) as outlined above (Section 5.5). 5.8 Change Order Protests/Disputed Work If the Contractor disagrees with any terms and conditions of a Change Order or a Field Order, a written protest must be submitted to Township of West Orange within 15 days of receipt of the Change Order in accordance with Section 104.03 of the 2019 NJDOT Standard Specifications. Township of West Orange will notify NJDOT-BLA of the Contractor’s written protest. Submission of written protest will not relieve the Contractor from obligation to proceed with the 30 | P a g e
File revisions (1)
- Sep 29, 2026
1227a7e49ff07,987,641 bytes