Supporting Documentation · Nov 12, 2024
312-24 Exhibit A.pdf
9ae9abf7f042379af36a349df8d8556ee83b8a4b9b23e0c4efbdc4c665922b0dIndexed text · page 3
Show all pagesBen Shaffer Recreation SEN O. Box 844 * SHAFFER r: P p | RECREATION Lake Hopatcong NJ 07849 US ro osa TERMS REP DATE Proposal # Net 30 Scott 10/24/2024 4380-1 Tumminello BILL TO SHIP TO CONTACT West Orange Township West Orange Recreation William Kehoe Accts, Payable Dept. Degnan Park 66 Main Street West Orange NJ 07052 NJCPA COOP BC-BID-24 West Orange NJ 07052 35 As requested, we are pleased to quote the following BC-BID-24-35; using Co-op #11-BECCP Degnan Bleachers $79,623.87 The above items are priced In accordance with BC-BID-24-36; using Co-op #11-BECCP Approximate delivery time is 14-16 weeks after receipt of order. When placing your order, kindly advise whom the trucker should notify to schedule delivery. The trucker will make one contact and that person must inform any other parties to coordinate delivery Please make your Purchase Order payable to "Ben Shaffer Recreation Inc." Standard colors and finish are quoted unless noted. Final count is the responsibility of the contractor/purchaser. Note that assembly/installation is NOT provided. Sales Tax will be added if applicable. Aluminum angls understructure with 8” Rise / 24" Run 36 inch elevation, 63 inch clear front walkway 2 x 10 anodized aluminum seat plank with poly end caps Double 2 x 10 mill finish aluminum foot plank with aluminum end caps 1 x 6 riser rows 1 - 7 and (2) 1 x 6 top row risers mill finish (4) 4'-6" wide vertical aisle with mid aisle handrail 1 set of entry stairs Chain link guardrail system (1) Switch Back ADA accessiblility ramp + 4 Wheel chair spaces **Economical mill finish foot plank and risers have been specified on this quote. NRS will not be responsible for discoloration or staining (dark black, brown, or white residue) resulting from unavoidable condensation that occurs during packing, transporting and storage, preceding and/or during installation. Removal of theses stains or replacement of boards upon completion of installation is not part of this contract because stained mill finish boards meet all specified requirements, A clear anodized finish may be quoted at an additional cost to avoid potential discoloration or staining. Degnan Bleachers Page 2/4
File revisions (1)
- Sep 29, 2026
9ae9abf7f042168,331 bytes