Supporting Documentation · Dec 10, 2024
344-24 Exhibit A-West Orange 2022 SRTS PE Proposal Rev 07-16-2024.pdf
Preserved file SHA-256
38b8cc417a7599e906bd1d0e240db8231d460975af23d344e284695c35098612Indexed text · page 10
Show all pagesMaximum Hourly Rate: $120.00 $75.30 $64.00 $47.20 $54.00 Average Hourly Rate: $103.48 $75.30 $62.23 $45.73 $54.00 ‐ 0 0 0 0 0 0 $0.00 Conduct Topographic Survey 3020 10 25 60 100 100 295 $16,624.10 Prepare Base Maps 3025 10 80 0 300 390 $23,258.80 Total Hours 20 105 60 100 400 685 Total $ $2,069.60 $7,906.50 $3,733.80 $4,573.00 $21,600.00 $39,882.90 Township of West Orange NJDOT Safe Routes to School (SRTS) Design Assistance Program PRELIMINARY ENGINEERING FEE SUMMARY Activity No. SRTS ‐ 2022 ‐ Pedestrian Improvements November 13, 2023 Activity Project Manager Professional Surveyor Senior CADD Operator Senior Party Chief Technician/C ADD Operator Total Hours FOR GPI SURVEYING SERVICES Total