Supporting Documentation · Dec 10, 2024
344-24 Exhibit A-West Orange 2022 SRTS PE Proposal Rev 07-16-2024.pdf
38b8cc417a7599e906bd1d0e240db8231d460975af23d344e284695c35098612Indexed text · page 11
Show all pagesFIXED FEE CALCULATION PROJECT: SRTS-2022 Township of West Orange Pedestrian Improvements - Preliminary Engineering CONSULTANT: Greenman-Pedersen, Inc. (GPI) AGREEMENT OR CAM NO. PREPARED BY: Dale Foster DATE: 16-Jul-24 EVALUATE PROJECT SPECIFICS: Directions: Prime Consultant will use Total Project Design Cost (or Task Order Design Cost) for the SIZE criteria Each Subconsultant will assign points for SIZE, COMPLEXITY, DURATION, & DEGREE OF RISK based on its specific project tasks. SPECIFICS CRITERIA POINTS RATING SIZE: SMALL - Total Fee (Project Design Cost) < $1,250,000 15 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 COMPLEXITY: SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, 10 15 Restoration, Concept Development, Studies, Surveys, Landscape, Inspections STANDARD - Moderate Scope; Rehabilitation, New, 15 or Reconstruction COMPLEX - Multi-disciplined, Highly Specialized, 20 or Major Unusual DURATION: STANDARD - Appropriate Schedule 15 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 DEGREE OF RISK: LEVEL 1 - Low Risk of Claims; Limited Scope of Work, Deck 20 30 Patching, Resurfacing, Restoration, Concept Development, Studies, Surveys, Landscape, Inspections LEVEL 2 - Average Risk of Claims; Standard Complexity 30 or Level 1 with High Public Exposure LEVEL 3 - High Risk of Claims; Hazardous, Experimental, 40 or Bonus/Penalty Clauses TOTAL RATING = 75 CALCULATE FEE: PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.75 FEE FACTOR ( Project Specifics Factor x 0.30) = 0.225 DIRECT LABOR COSTS 93,955.94$ TOTAL FEE (Direct Labor Costs x Fee Factor) = 21,140.09$ Fixed Fee Calculation Page 1 Revised 08/12/2015
File revisions (1)
- Sep 29, 2026
38b8cc417a751,861,112 bytes