Supporting Documentation · Dec 10, 2024
344-24 Exhibit A-West Orange 2022 SRTS PE Proposal Rev 07-16-2024.pdf
38b8cc417a7599e906bd1d0e240db8231d460975af23d344e284695c35098612Indexed text · page 8
Show all pagesSRTS-2022 Design Assistance Program Township of West Orange November 13, 2023 Revised July 16, 2024 Page 8 of 8 The required CED will be prepared by NJDOT BEPR with input from GPI on Sections I and II. A Design Exception Report is not required and therefore preparation of the same is not included in this scope of services. Lighting design and electrical design are not anticipated for the scope of this project. Modifications will not be required to the existing roadway profile or roadway cross slopes. Full depth pavement and/or pavement resurfacing will be limited to the narrow strips of pavement removal and replacement necessary to install the proposed curb. As this is a Township led project, we do not anticipate the need to establish utility funding and therefore this activity is not included in this scope of services. We do not anticipate utility impacts and/or the preparation of utility agreements and therefore this activity is not included in this scope of services. Utility Work, if encountered, will be the responsibility of others. We do not anticipate the need to prepare a Final Design Scope Statement and therefore this activity is not included in this scope of services. Driveway widths and locations will not be modified. The total net new impervious and total disturbance will be less than ¼ acre and one acre, respectively; therefore, it will not be necessary to comply with SWM Rules. Soils testing for Best Management Practices (BMPs) such as stormwater basins and/or green infrastructure are not included in this scope of services. A Cultural Resource Study Phase IA is not included in this scope of services. Any coordination with the NJDEP to secure permits or approvals requiring a Phase IA will be conducted by NJDOT BEPR and SHPO. Green Acres coordination, if required, will be conducted by NJDOT BEPR and NJDEP. Hazardous waste investigations and studies, if necessary, are to be performed by NJDOT and therefore not included in this scope of services. CADD drawings and design will be produced in Autodesk AutoCAD Format. Cost Estimate – A copy of the proposed costs for the aforementioned services is attached. We would be happy to discuss this scope of services with you, at your convenience. Thank you for the opportunity to provide professional engineering design services to the Township of West Orange. Should you have
happy to discuss this scope of services with you, at your convenience. Thank you for the opportunity to provide professional engineering design services to the Township of West Orange. Should you have any questions, please do not hesitate to contact Andrew Cangiano, PE, CME at acangiano@gpinet.com or myself. Sincerely, Greenman-Pedersen, Inc. Dale Foster, P.E. Senior Project Manager / Vice President 520 Route 22 East Suite 200 Bridgewater, NJ 08807 Phone: 908.236.9001 Email: dfoster@gpinet.com
File revisions (1)
- Sep 29, 2026
38b8cc417a751,861,112 bytes