Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 10, 2024

344-24 Exhibit A-West Orange 2022 SRTS PE Proposal Rev 07-16-2024.pdf

Preserved file SHA-25638b8cc417a7599e906bd1d0e240db8231d460975af23d344e284695c35098612

Indexed text · page 9

Show all pages
Page 9

Maximum Hourly Rate: $120.00 $108.00 $100.50 $80.50 $59.00 $41.00 $95.50 $51.00 $51.00 Average Hourly Rate: $103.89 $94.62 $74.32 $62.56 $49.10 $35.98 $72.50 $42.72 $40.30 Project Management: Scheduling and Coordination ‐ 20 14 26 0 0 0 0 0 0 60 $5,334.80 Prepare Survey Control Report 3015 0 0 4 0 0 0 0 0 0 4 $297.28 Conduct Topographic Survey 3020 1 0 2 4 4 0 0 0 0 11 $699.17 Prepare Base Maps 3025 1 2 4 8 0 4 3 0 0 22 $1,452.31 Prepare Horizontal and Vertical Geometry 3030 2 8 10 46 32 24 0 0 0 122 $7,020.42 Prepare Utility Base Plans 3035 0 2 4 8 8 2 0 0 0 24 $1,451.76 Send Utility Verification Request Letter 3045 0 0 2 4 4 2 0 0 0 12 $667.24 Update Base Plans and Identify Conflicts 3055 0 2 2 4 10 6 0 0 0 24 $1,295.00 Prepare Preliminary Roadway Plans 3070 4 6 4 38 24 40 12 8 0 136 $7,487.20 Prepare Preliminary Drainage Design 3085 0 4 0 4 24 12 0 0 0 44 $2,238.88 Determine Traffic Engineering Facility Locations 3090 6 8 12 54 60 32 1 0 0 173 $9,820.24 Prepare ROW Report 3110 0 2 0 4 16 0 0 0 0 22 $1,225.08 Initiate ROW Impact Plan 3115 0 2 2 8 12 8 4 0 0 36 $2,005.40 Hold ROW Kickoff Meeting 3120 2 4 2 0 8 0 0 0 0 16 $1,127.70 Update Preliminary Detour / Construction Staging Plans 3130 2 4 8 2 12 8 0 0 0 36 $2,182.98 Prepare Construction Cost Estimate 3135 1 3 0 0 12 0 0 0 0 16 $976.95 Prepare Draft PE Report 3160 2 2 24 4 4 0 0 0 0 36 $2,627.34 Municipal & NJDOT Reviews Draft PE Report 3205 2 0 2 4 0 0 0 0 0 8 $606.66 Hold Public Information Center 3865 6 8 14 0 16 0 0 4 0 48 $3,377.26 Prepare Categorical Exclusion Document 3870 1 2 9 0 16 12 0 0 0 40 $2,179.37 $0.00 Total Hours 50 73 131 192 262 150 20 12 0 890 Total $ $5,194.50 $6,907.26 $9,735.92 $12,011.52 $12,864.20 $5,397.00 $1,450.00 $512.64 $0.00 $54,073.04 Notes: 1. Actual hourly rates of individuals working on the project will be billed and may be above or below the average hourly rate listed. 2. Preliminary Engineering anticipated to be performed in 2024 ‐ 2025 3. Hourly rates are as of 07/01/2023. Subconsultants: (see attached MFS proposal) Grand Total $338,880.15 MFS (formerly GEOD) $65,097.86 Total Activity No. Township of West Orange NJDOT Safe Routes to School (SRTS) Design Assistance Program SRTS ‐ 2022 ‐ West Orange Safe Routes to School PRELIMINARY ENGINEERING FEE SUMMARY November 13, 2023 (REVISED July 16, 2024) Activity

Page 9

ange NJDOT Safe Routes to School (SRTS) Design Assistance Program SRTS ‐ 2022 ‐ West Orange Safe Routes to School PRELIMINARY ENGINEERING FEE SUMMARY November 13, 2023 (REVISED July 16, 2024) Activity Junior Engineer Project Manager Senior Engineer Project Engineer Engineer Senior Tech Associate Engineer Total Hours Assistant Tech GPI Total $273,782.29 $500.00 Engineering Labor Mileage $54,073.04 x 1.6783 Overhead $157,686.26 Fixed Fee (22.5% Labor) $21,140.09 Printing / Postage / misc. $500.00 Technician Surveying Labor $39,882.90

File revisions (1)