Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 10, 2024

350-24 Proposal.pdf

Preserved file SHA-256bf7ea63d40b5986fdbf4e8a583cc601af49eba8097c43507a04200f829fc887e

Indexed text · page 2

Show all pages
Page 2

Request for Proposals: South Valley Road Corridor West Orange Township, Essex County, New Jersey 240345 December 2, 2024 Page 2 of 9 70 South Orange Avenue, Suite 109 P.O. Box 99 Livingston, New Jersey 07039 Roseland, NJ 07068 C: (732) 236-7557 T: (973) 228-0999 F: (201) 753-3904 BrightViewEngineering.com SECTION I – SCOPE OF SERVICES TASK 1 – Crosswalk Evaluation– South Valley Road & Ridgeview Avenue / Meeker Street Per MUTCD guidelines, this task will first consist of a field visit to the intersection of South Valley Road and Ridgeview Avenue / Meeker Street to evaluate the intersection for the addition of a crosswalk across South Valley Road. This review will identify potential locations for the crosswalk, taking into account vehicular and pedestrian sight lines; existing on street parking; and existing infrastructure, such as curb ramps, utilities, drainage and private driveways. Based on the results of the field visit, BVE will prepare a suitably illustrated letter report detailing our findings and recommendations. This will include a concept sketch which will identify the most appropriate location for a proposed crosswalk and an order of magnitude cost estimate for construction budgeting purposes. TASK 2 – South Valley Road Signing and Striping Evaluation This task will include a review of the existing signing and striping along South Valley Road from south of Luddington Road to Wellington Avenue with the intent of identifying any missing or obsolete signage and identify recommendations for additional signs / striping where appropriate. Our results will be provided in a brief report of findings which will include a concept sketch showing recommended changes and improvements to the existing traffic control along the corridor. SCHEDULE Work will begin upon notice to proceed; we anticipate providing our findings within four weeks of the start of work, provided weather is favorable for field investigations.

File revisions (1)