Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 28, 2025

43-25 RFP-Responses-Rock Spring Golf Course.pdf

Preserved file SHA-25629ee54b341aaefe2d6b741aac05ebd74f52a053c580b074f98f81436bfbd78b4

Indexed text · page 164

Show all pages
Page 164

Zayibeth Caraballo Director, Municipal Engineer Township of West Orange January 15, 2025 implement the construction of the project (“Work”). The Contractor shall coordinate, supervise and direct all aspects of the Work and shall be solely responsible for, and have control over, construction means, methods, techniques, sequences and procedures, safety, and security. To the fullest extent permitted by law, the Contractor shall defend, indemnify and hold harmless Client, GPI, GPI’s subconsultants, and their respective directors, officers, employees and agents or any of them from and against all claims, damages, losses and expenses, including attorney’s fees, arising out of or in connection with the Contractor’s Work. Contractor shall provide insurance and shall name Client, GPI and GPI’s subconsultants as additional insured on Contractor’s Commercial General Liability Insurance policies. 27. Indemnification: a. b. c. GPI, subject to the limitation in Section 21 herein, agrees to hold the Client harmless from and against all claims arising out of the negligent professional acts, errors, and omissions of GPI in connection with the performance of the Services described in this Agreement. GPI shall not be responsible for the acts or omissions of the Client, Contractor or any third parties in connection with or arising out of the project. Client hereby holds harmless and indemnifies GPI against all claims, damages, costs, suits, expenses, and attorney’s fees which may be incurred by GPI which arise out of the foregoing. Expenses shall include, but not be limited to time charges by GPI’s employees at GPI’s then standard hourly fees. Client shall make no claim for professional negligent acts, errors, omissions and/or alleged breach of contract either directly or in a third party claim, against GPI unless the Client has first provided GPI with a written certification executed by an independent design professional practicing in the same discipline as GPI and licensed in the state in which the project for which GPI’s services were rendered is located. This certification shall: a) identify the name and license of the certifier; b) specify each and every act or omission that the certifier contends is a violation of the standard of care expected of a design professional performing professional services under similar circumstances; and c) state in complete detail the

Page 164

n that the certifier contends is a violation of the standard of care expected of a design professional performing professional services under similar circumstances; and c) state in complete detail the basis for certifier’s opinion that each such act or omission constitutes a violation. This certificate shall be provided to GPI not less than thirty (30) calendar days prior to the presentation of any claim or the institution of any legal proceeding. 28. Force Majeure: If the performance of Services by Consultant is affected by causes beyond its reasonable control, force majeure shall result. Force Majeure includes acts of God, acts of a legislative, administrative, or judicial entity, governmental order, war, fires, floods, labor disputes, pandemic, COVID-19 and unusually severe or unanticipated weather which prevent Consultant from performing the Services hereunder (“Force Majeure”). Should a Force Majeure event occur, Consultant shall receive day-for-day Schedule relief based on the number of days the Force Majeure prevents Consultant from performing the Services. Consultant shall not be liable for failure to comply with any Force Majeure event. Page | 6

File revisions (1)