Supporting Documentation · Jan 28, 2025
44-25 Exhibit B-Complete - VI Letter Report - DPW West Orange - April 2023.pdf
d01d6da8ac673541ebce773230c2d197fc86f0337f0242c0d75abfa40efc6786Indexed text · page 20
Show all pagesProvide any information that may be pertinent to the sampling event and may assist in the data interpretation process. Active DPW maintenance/storage garages attached directly to office space Indoor air sampled in office space only; sub-slab soil-gas sampled in offices and garages Part V – Sampling Information Eric Snee 2101 951 - __________ Sample Technician: ____________________________ Phone number: ( 732 ) _______ Company: __________________________________________________________________________ CME Associates Sample Source: Indoor Air / Sub-Slab / Near Slab Soil Gas / Exterior Soil Gas Were “Instructions for Occupants” followed? Yes / No If not, describe modifications: __________________________________________________________ Sample locations (floor, room): Sample # Location Analytical Method Sample Volume Sample Time Sample Date Sampler Type Ambient Temp ( °F) Drawing of Sample Location(s) in Building Type of field instrument used (include summary of results): ____________________________ Part VI - Meteorological Conditions Was there significant precipitation within 12 hours prior to (or during) the sampling event? Yes / No 4/1/23 - temps in 50s to 70s, periodic rain, increasing winds Describe the general weather conditions: __________________________________________________ evening of 4/1 to morning of 4/2 - thunderstorms, strong winds; 4/2/23 - 40s to 50s, partly cloudy ____________________________________________________________________________________ D-3
File revisions (1)
- Sep 29, 2026
d01d6da8ac674,424,403 bytes