Supporting Documentation · Jan 28, 2025
2891-25 Final Ordinance WO SJ Tier_3_Complete and Green Streets Model.pdf
f56aa731ac2b54cab4c5fc44d676ee9b4c84e434017d00f89888dd75f3a19c42Indexed text · page 11
Show all pages4. The Land Use Board for Planning and Zoning shall be responsible for completing the checklists and/or reviewing the checklists. 5. A Complete and Green Streets checklist shall entail but is not limited to: a. Existing pedestrian, bicycle, transit, motor vehicle, and truck/freight accommodations (facilities) and operations b. Traffic volumes c. Existing safety and/or access issues, and Americans with Disabilities Act (ADA) compliance d. Land use within the study area, including trip generators e. Existing and proposed streetscape elements including furniture, trees or other environmental and stormwater enhancements f. Review of existing plans g. Proposed pedestrian, bicycle, transit, motor vehicle, and truck/freight accommodations (facilities) and desired future operations h. ADA compliance of the proposed design i. Compatibility with the surrounding land use and density j. Consistency with applicable design standards and guidelines k. Opportunities to improve public health through physical activity and mobility options l. Opportunities to manage stormwater through green infrastructure 6. All Complete and Green Street checklists shall be made accessible online and available to the Complete and Green Streets Advisory Body. Effective Date The Complete and Green Streets policy shall take effect on February 11, 2025 provided that it shall not apply to any transportation project for which a preliminary design has been completed on or before December 31, 2024.
File revisions (1)
- Sep 29, 2026
f56aa731ac2b152,042 bytes