Supporting Documentation · Mar 11, 2025
96-25 Exhibit A.pdf
3684b84dcb8edded7d1386ce1788095680d513c14bdb0ee03a90f031969b75b5Indexed text · page 4
Show all pagesGeotechnical Laboratory Testing Matrix will subcontract and arrange for appropriate geotechnical laboratory tests on selected representative soil samples recovered during the field operations. We anticipate performing geotechnical laboratory tests for moisture content, grain size analysis, and Atterberg limits (plasticity indices) to determine the engineering index characteristics of the soils. Engineering Evaluation Matrix will evaluate the field and laboratory data to determine the impact of subsurface conditions on the planned construction. Reporting Matrix will prepare a geotechnical report of the investigation which will include: • Boring location plan • Boring logs including descriptions of the subsurface materials, standard penetration test data • Description of subsurface conditions • Laboratory testing results • Recommendations for excavation and controlled fill • Recommended geotechnical design parameters • Foundation recommendations PROJECT COST AND SCHEDULE The total cost to conduct the above tasks for the Site is $22,260. Task 1 – Preliminary Assessment Labor .................... ............................................................................................................ $ 7,500.00 Direct Expenses (NJ PA - EDR package) ......................................................................... $ 1,260.00 Task 1 Estimated Costs..................................... $ 8,760.00 Task 2 – Geotechnical Engineering Services Labor and Direct Expenses (Driller, Analytical, Travel).................... .................................. $ 13,500.00 Task 2 Estimated Costs..................................... $ 13,500.00 TOTAL COSTS ................................................. ….$22,260.00 The above work will be completed in accordance with Matrix’s Terms and Conditions (Attachment 1). Matrix is prepared to start work on this project immediately after receipt of the notice to proceed. The return of a signed copy of this letter shall constitute authorization to proceed. We thank you for the opportunity to be of service to you on this project. ASSUMPTIONS AND EXCLUSIONS This proposal is based on the following assumptions: • Costs assume that all areas are accessible for inspection; • No additional assessment, investigation or remediation activities are included; • No client meetings will be required; • Costs do not include any
assume that all areas are accessible for inspection; • No additional assessment, investigation or remediation activities are included; • No client meetings will be required; • Costs do not include any environmental soil sampling activities; • Costs do not include future soil or groundwater remediation; • Costs exclude any NJDEP inspections; 4
File revisions (1)
- Sep 29, 2026
3684b84dcb8e505,804 bytes