Supporting Documentation · Mar 11, 2025
96-25 Exhibit A.pdf
3684b84dcb8edded7d1386ce1788095680d513c14bdb0ee03a90f031969b75b5Indexed text · page 5
Show all pages• • • • • • • Costs do not include additional borings or test pits if required beyond the scope of work provided above; Costs do not include foundation, slab, or pavement design; Costs do not include Site specific seismic evaluation; Costs do not include preparation of drawings; Costs do not include construction oversight or inspection services; Costs do not include any additional NJDEP notification or reporting fees; and All external costs will be charged at cost plus 15%. We thank you for the opportunity to be of service to you on this project. If you have any questions or require any additional information, do not hesitate to contact me at (973) 240-1800 or at amolnar@mnwe.com. Sincerely, Allison Molnar Project Manager 5
File revisions (1)
- Sep 29, 2026
3684b84dcb8e505,804 bytes