Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 11, 2025

2899-25 Stop Control Reports Combined.doc.pdf

Preserved file SHA-256f3256ed2c1522e4551b471642c5aa371be34b8d675a046c64aa454d027145535

Indexed text · page 20

Show all pages
Page 20

Safety Study Cheshire Terrace & Nottingham Road Project No.: 241193 February 4, 2025 Page 6 of 7 70 South Orange Avenue, Suite 109 PO Box 99 Livingston, New Jersey 07039 Roseland, NJ 07068 C: (732) 236-7557 T: (973) 228-0999 F: (201) 753-3904 BrightViewEngineering.com STOP Sign Installation – A STOP control on the minor-road approach should be considered as per Section 2B.11-Minor Road Stop Control of the MUTCD (11th Edition). The STOP sign would provide the appropriate traffic control at the study intersection to improve safety and circulation of traffic. We recommend that the Township install a STOP sign on Cheshire Terrace at the study intersection. The installation of the STOP sign should be implemented per the guidance presented within Chapter 2B-Regulatory Signs, Barricades, and Gates of the MUTCD (11th Edition). FIGURE 4 – STOP Sign Installation Striping and Signages – We recommend that the Township provide a stop bar and double yellow line striping on Cheshire Terrace to support the stop sign. Sidewalk and Crosswalk Markings – We recommend that the Township consider installing sidewalks and marked crosswalks within the study area to improve pedestrian safety and circulation. The implementation of the roadway striping, and signs should follow the guidance presented within the latest edition of the MUTCD. NOTTINGHAM ROAD

File revisions (1)