at Location of Former Rai! Line and AOC-11B - Historic Fill - Miscellaneous Subsurface Fill and Building Debris throughout Site - AOC-I5B - Staining at Exterior Truck Park, South of Storage Garage - AOC-18B - Former Edison: Concrete Coal Trestle (Rail Siding)

Page 10

| t | | | cea eve ASSOCIATES April 14, 2023 Mr. John Gross Page 4 of 8 Township Business Administrator/CFO Re: Department of Public Works af 25 Lakeside Avenue — Remedial Investigation ~ AOC-19 - Groundwater Contamination from Unknowr/OfFSite Chlorinated Solvent Sources Up to fifty (50) soil borings will be advanced to depths that range between approximately five (5) to twenty (20) feet below ground surface (ft bgs). CME personnel will log al! borings and will utilize a photoionization detector (PID) to screen for the presence of volatile organic compounds (VOCs). All boring locations will be surveyed using GPS equipment. The soil samples at each AOC location will be analyzed for different parameters, including EPA Target Compound List volatile organic compounds (TCL VO+TICs), semi yolatile organic compounds (TCL SVO+TICs) with a library search of the fifteen (15) highest Tentatively Identified Compounds (TICs) or PAHs, PCBs and TAL Metals. All soil samples will be submitted to a NJDEP-certified analytical laboratory for analysis. One (1) field blank sample will also be collected each day of field activities. The field blank(s) will be handled and transported in the same manner and analyzed for the same parameters as the samples collected that day. The samples will be collected and equipment will be decontaminated in accordance with the NIDEP Field Sampling Procedures Manual (August 2005 edition, revised April 2011). All samples will be submitted to a NELAP-aceredited and NJDEP-certified laboratory for analysis ona standard turnaround time. Upon receipt of laboratory test results, CME will compare all groundwater sample results against the current NIDEP Groundwater Quality Standards (GWQS) for Class H-A Aquifers (N.LA.C. 7:9C) and the NIDEP Vapor Intrusion Screening Levels (VISL). All the field work implemented at the Site during the site investigation will be supervised; field screening techniques will be performed in accordance with the NJDEP Technical Requirements for Site Remediation (N.J.A.C. 7:26E) to determine the potential presence of impacted materials. ‘TASK 2: GROUNDWATER INVESTIGATION ~ MONITORING WELLS INSTALLATION Four (4) monitoring wells (MW-12 through MW-15) will be installed to assist in the proposed remedial action monitoring at the site. CME will retain a licensed driller to install the monitoring wells with 2-inch diameter

Page 10

wells (MW-12 through MW-15) will be installed to assist in the proposed remedial action monitoring at the site. CME will retain a licensed driller to install the monitoring wells with 2-inch diameter PVC; three wells will be constructed to a depth of approximately (20)

Page 11

ft i Cc ASSOCIATES Mr. John Gross April 14, 2023 Township Business Administrator‘CFO. Page 5 of 8 Re: Department of Public Works at 25 Lakeside Avenue -- Remedial Investigation feet and one well will be constructed as a double-cased deep well and will be installed to a depth of 40-45 feet below ground surface (bgs). Based on the regional geology at the site vicinity, it is expected that the subsurface materials encountered will consist primarily of shale bedrock. The depths and locations of the monitoring wells will be determined based on the findings of the investigations conducted to date to delineate the extent of contaminants identified during the initial sampling event. The wells will be completed with a flush-mount cover, Drill cuttings will be placed in drums and properly disposed off-site at a licensed facility, and development water will be drummed for off- site disposal or properly treated prior to on-site discharge. A professional licensed surveyor will survey the monitoring wells. Well logs and Form A and Form B will be prepared to properly document the weil construction. TASK 3; GROUNDWATER SAMPLING Two (2) rounds of groundwater samples will be collected from all monitoring wells to delineate the impacted groundwater and evaluate trends and seasonal fluctuations in contaminant concentrations and provide a baseline dataset for further remedial investigation, if needed. + Two rounds of groundwater samples will be collected using existing wells and proposed monitoring wells MW-4 through MW-9. Sampling will be performed in accordance with USEPA Low Flow Sampling Procedures (March 1998), + Water levels will be measured in. all monitoring wells to confirm the groundwater flow direction. Water quality parameters will be directly measured in the field including conductivity, pH, temperature, redox potential, salinity, and dissolved oxygen (DO). + All groundwater samples will be submitted for laboratory analysis for Target Compound List (TCL) VOCs and TCL semi volatile organic compounds (SVOCs) and TAL Metals in accordance with the TRSR and NJDEP guidance documents. Trip blank samples will accompany the groundwater sample(s) and will be analyzed for TCL VOCs and TBA. One (1) field blank sample will also be collected each day of field activities. The blanks will be handled and transported in the same manner and analyzed for the same parameters

Page 11

for TCL VOCs and TBA. One (1) field blank sample will also be collected each day of field activities. The blanks will be handled and transported in the same manner and analyzed for the same parameters as the samples collected that day. If groundwater contamination is delineated, additional groundwater sampling may be performed to evaluate compliance with remediation standards and determine if natural attenuation and CEA can be used as the groundwater remedial action at the Site; costs of the additional sampling are not included in this proposal. If groundwater contamination is not delineated, additional monitoring wells and sampling will be required; costs is not included in this proposal.

Page 12

t ASSOCIATES Mr. John Gross April 14, 2023 Township Business Administrator/CFO Page 6 of 8 Re: Department of Public Works at 25 Lakeside Avenue — Remedial Investigation Task 4: LSRP PROJECT MANAGEMENT, REPORTING - DATA EVALUATION AND REMEDIAL INVESTIGATION REPORT LSRP Project Management: Licensed Site Remediation Professional (LSRP) services are required to be completed to comply with NIDEP regulatory requirements. CME will provide effective project management services to complete the work proposed herein and will coordinate with the Borough and their subcontractor(s), CME’s subcontractor(s), and the NJDEP, as necessary. CME’s assigned LSRP will oversee remedial activities at the Site, prepare/certify related reports, and submit the required Site Remediation Reform Act (SRRA) forms to the NJDEP. Task 4.1: Heatth and Safety Plan A site-specific Health and Safety Plan (HASP) will be prepared in accordance with applicable Occupational Safety and Health Administration (OSHA) regulations and industry health and safety standards. The HASP will specify the health and safety procedures to be followed during implementation of the field activities at the Site in order to protect on site personnel and the general public, respond to emergencies, comply with environmental regulations, and prevent pollution as a result of work operations. Task 4.2: Quality Assurance Project Plan A site-specific Quality Assurance Project Plan (QAPP) for the proposed investigation activities will be prepared in accordance with the requirements at NJ.A.C. 7:26E-2.2 and NJDEP guidance documents. The QAPP will specify the quality assurance (QA) and quality control (QC) procedures to be implemented during the field activities at the Site. Task 4.3: Update Receptor Evaluation Pursuant to N.J.A.C. 7:26E-1.12 et seq., the receptor evaluation must be updated and submitted to the NJDEP along with any key document submittal (e.g., RIR). Accordingly, CME will conduct a receptor evaluation update based on the findings of the investigations proposed herein. CME will also complete and subriit the required Receptor Evaluation Form to applicable government agencies (e.g., NJDEP, health department, municipal clerk). PROPOSED BUDGET The budget for completion of the proposed scope of work is $198,940 as indicated in the following table: Task | Description Cost

Page 13

ASSOCIATES Mr. Join Gross April 14, 2023 Township Business Administrator/CFO. Page 7 of 8 Re: Department of Public Works at 25 Lakeside Avenue ~ Remedial Investigation 1 Soil Delineation - Soil Borings and Sampling $ 69,070 Groundwater Investigation — Monitoring Wells Installation $ 68,290 3 Groundwater Sampling $ 30,700 LSRP Project Management, Reporting - Data Evatuation and 4 ee $ 30,880 Remedial Investigation Report Total $198,940 The proposed budget includes approximately $130,000 for subconiractor’s fee, including laboratory analysis, equipment cost, etc., and NJDEP fees. The budget contained in this proposal is the firm’s best estimate of the effort required to carry out the project as outlined in the scope of work. However, the client will be billed for the actual effort expended to implement the Scope of Services in accordance with the atiached billing rates for Environmental Engineering and LSRP services. In no event will the client be bitled or work performed in excess of the proposal amount without client's prior approval. ASSUMPTIONS AND LIMITATIONS The scope of work is limited to the tasks outlined above. Based on the investigation findings, additional remediation activities may be required to comply with N.J.A.C. 7:26E and close the case. A separate cost proposal will be provided for any additional work. SPECIAL CONDITIONS FOR LSRP SERVICES + The enactment of the Site Remediation Reform Act (SRRA; N.J.S.A. 58:10C-L et seq) on May 7, 2009, and the adoption of the Administrative Requirements for the Remediation of Contaminated Sites (ARRCS; N.J.A.C, 7:26C) on November 4, 2009 require that all new remediation cases follow the provisions of SRRA. A key requirement of these rules is that a Licensed Site Remediation Professional (LSRP) must oversee all new remediation cases. « The ARRCS requires the person responsible for conducting a remediation to notify the NJDEP of any confirmed discharges of contaminants or condition of Immediate Environmental Concern (“IEC”), Please note that being an LSRP, as a State licensed professional, I will thus have the obligation to report any such conditions to the NIDEP without obtaining any prior approval from the client. ¢ LSRP will provide the required services in accordance with SRRA and has the obligation to submit, maintain and preserve the relevant documents.

Page 14

} i | | | April 14, 2023 Mr. John Gross Page 8 of 8 Township Business Administrator/CFO Re: Department of Public Works at 25 Lakeside Avenue — Remedial Investigation LSRP ig not responsible for client's failure to disclose relevant information, perform SRRA obligations, fund remediation, and follow LSRP’s recommended actions. Client's failure to perform these obligations may resuit in fines/penalties by the NJDEP. The issuance of RAO by LSRP is not a guarantee or warranty that the site is free of contamination. or that it will be accepted by the NJDEP. + NJDEP may audit the RAO within three (3) years after the date the LSRP filed the RAO with the NJDEP. LSRP is not responsible for additional requirements imposed by NJDEP after review/audit, except to the extent they arise out of LSRP's negligence. We appreciate the opportunity to submit this proposal and assist the Township on this project. Should you have any questions, please do not hesitate to call me at 732-951-210!. extension 103. Respectfully submitted, CME Associates Rh } gst “Se OL, Chany Behram Turan, P.E., LSRP- Principal Director of Environmental Services Enclosure cc: Michael McClelland, P.B., P.P. - Partner / CME Associates

Page 15

ASSOCIATES MUNICIPAL ENGINEERING SERVICES GENERAL CONDITIONS AND HOURLY RATE SCHEDULE TO JANUARY 4, 2024 Senior Project Manager, Project Manager. Project Leader .. Professional Engineer Senior Project Engineer. Project Engineer. Senior Design Engineer. Design Engineer. Drone Pilot. Senior Engineering Technician.. Engineering Technician/Management information Systems Technician Drone Technician .. Professional Land Surveyor Land Surveyor .. Robotic Total Station Party Chief. Survey Technician. Resident Engineer. Chief Construction Engineer. Senior Construction Engineer. Construction Engineer. Chief Coristruction Technician Senior Construction Technician, Construction Technician Technical Assistant. Senior CAD Technician Licensed Landscape Architect. Senior Landscape Designer Certified Tree Expert ... Landscape Designer. Director of Planning Professional Planner .. Project Planner Planning Technician $187.00 Per Hour - $184.00 Per Hour $179.00 Per Hour . $143.00 Per Hour .$129.00 Per Hour .. $106.00 Per Hour $ 94,00 Per Hour $ 88,00 Per Hour .. $101.00 Per Hour $135.00 Per Hour $183.00 Per Hour $164.00 Per Hour $146.00 Per Hour $130.00 Per Hour $188.00 Per Hour $187.00 Per Hour $155.00 Per Hour $133.00 Per Hour $191.00 Per Hour $180.00 Per Hour $201.00 Per Hour Managing Partner/Administrative Partner. Environmental services will bo billed in accordance with CME’s Envlronmontal Rata Schadule Invoices - CME Associates (CME) will submit invoices (o Client monthly and a final invoice upon completion of services. Paymont is due upon presentation of invoice and is past duo thiry days from invoice date, Ctiont agrees to pay a finance charge of one and one-half percent per month, or the maximum rate allowed by kw, on past due accounts. In the event that the invoice is not paid voluntarily and promptly, and must therefora bo referrad to an altomey or agency for collection, the Client agrees to pay a collection fee aqual to tha actual attomey or ageney collaction fee incurred by CME. Gverlime rates ara applicable after eight hours Monday through Friday, and all day Saturday and Sunday, and charged at one and one-half times the quoted rete. Holidays are charged at two times the quoted rate. Expenses incurred for reproduction, postage harilling, photographs and for services including subconsultants equipment and faciliies not furnished by CME are charged to the

Page 15

two times the quoted rate. Expenses incurred for reproduction, postage harilling, photographs and for services including subconsultants equipment and faciliies not furnished by CME are charged to the Client at cost plus fifteen percent. Automobile travel may be charged at the current rate par mile allowed by the Intemal Revenue Service. Standard of Gare - Services performed by CME under this Agreement will be conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currenlly practicing under similar conditions. NO OTHER WARRANTY, EXPRESSED OR IMPLIED, IS MADE, ted Material - it Is understood that CME Is not, and has no responsibility as a handler, generator, operator, treater or storer, transporter or disposer of hazardous or toxic substances found or identified et any site, Cllent shall undertake or arrange for, either directly or Indirectly through other contractors, the handling, removal, treatment, storage, transportation and disposal of hazardous substances or constituents found or Identified at any site. Ulilties - In the execution of the work, CME will lake ail reasonable precautions to avoid damage or injury to subterranean structuras or utiles. The Client agrees to hold CME harmless for any damages to subterranean siructures Which are not called to CME's atisntion and/or nol correctly shown on the plans furnishad | 1 |