Supporting Documentation · Mar 25, 2025
102-25 Exhibit A-Proposal.pdf
7a686c7c4cb2bdf62c05148d7273fe60de2550c838da06ee70685a5014f323f8Indexed text · page 5
Show all pagesF:\2025\25-0037 West Orange DPW\Proposal\Hazmat\Limited Hazmat Surv ey and demo specs propos al - 25 Lakeside _D PW_FINAL.docx 5 Task 2 – Survey Findings Summary Labor ..........................................................................................................................................$5,820.00 Total Estimated Cost for Task 2 ..................................................................................$5,820.00 Task 3 – Hazardous Materials Construction Documents Labor ..........................................................................................................................................$5,540.00 Total Estimated Cost for Task 3 ..................................................................................$5,540.00 Task 4 –Concrete Sampling Option 1 Labor ......................................................................................................................................... $6,600.00 Expenses (Analytical, Travel, Equipment, Etc.) ....................................................................... $9,560.00 Total Estimated Cost for Task 4 (Option 1) ...............................................................$16,160.00 Option 2 Labor ......................................................................................................................................... $8,720.00 Expenses (Analytical, Travel, Equipment, Etc.) ..................................................................... $27,780.00 Total Estimated Cost for Task 4 (Option 2) ...............................................................$36,500.00 Task 5 – Concrete Letter Report Labor ..........................................................................................................................................$7,660.00 Total Estimated Cost for Task 5 ...................................................................................$7,660.00 Task 6 – Contract Documents and Bid Support Labor ........................................................................................................................................$16,000.00 Total Estimated Cost for Task 6 .................................................................................$16,000.00 Task 7 – Project Management Labor
................................$16,000.00 Total Estimated Cost for Task 6 .................................................................................$16,000.00 Task 7 – Project Management Labor ..........................................................................................................................................$5,000.00 Total Estimated Cost for Task 7 ...................................................................................$5,000.00 TOTAL ESTIMATED COST FOR SCOPE OF WORK Option 1............................................$76,900.00 TOTAL ESTIMATED COST FOR SCOPE OF WORK Option 2............................................$97,240.00 Assumptions Based on the current understanding of the proposed project, Matrix has made the following assumptions. • Field work will be subject to the acceptable hours of the facilities. • As the building is in poor condition and scheduled for demolition, Matrix will make limited or no repairs to sampling locations unless it creates a safety hazard. • Matrix may make assumptions to materials that are deemed unsafe for destructive sampling which includes but may not be limited to live electrical equipment, flange gaskets to active pipes and areas not safely accessible (i.e., significantly damaged roof areas). • Matrix does not anticipate the need for ariel lifts or entering permit required confined spaces.
File revisions (1)
- Sep 29, 2026
7a686c7c4cb2545,650 bytes