Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 25, 2025

103-25 Exhibit A_Proposal.pdf

Preserved file SHA-25664ddfe90c12763508b493f7e5dec0e2ad4cdc6ea57adb71ea68dce3bb1c3630a

Indexed text · page 5

Show all pages
Page 5

5 Task 4 –Concrete Sampling Option 1 Labor ....................................................................................................................................................... $8,720.00 Expenses (Analytical, Travel, Equipment, Etc.) ................................................................................... $18,260.00 Total Estimated Cost for Task 4 (Option 1) ............................................................................ $26,980.00 Option 2 Labor ....................................................................................................................................................... $8,720.00 Expenses (Analytical, Travel, Equipment, Etc.) ................................................................................... $27,780.00 Total Estimated Cost for Task 4 (Option 2) ............................................................................ $36,500.00 Task 5 – Concrete Letter Report Labor ........................................................................................................................................................ $7,660.00 Total Estimated Cost for Task 5 ................................................................................................ $7,660.00 Task 6 – Contract Documents and Bid Support Labor ...................................................................................................................................................... $16,000.00 Total Estimated Cost for Task 6 .............................................................................................. $16,000.00 Task 7 – Project Management Labor ........................................................................................................................................................ $5,000.00 Total Estimated Cost for Task 7 ................................................................................................ $5,000.00 TOTAL ESTIMATED COST FOR SCOPE OF WORK Option 1 .......................................................... $95,195.00 TOTAL ESTIMATED COST FOR SCOPE OF WORK Option 2 ........................................................ $104,715.00 Assumptions Based on the current understanding of the proposed project, Matrix has made the following assumptions. • Field work will be subject to the acceptable hours of the facilities. • As the building is in

Page 5

s Based on the current understanding of the proposed project, Matrix has made the following assumptions. • Field work will be subject to the acceptable hours of the facilities. • As the building is in poor condition and scheduled for demolition, Matrix will make limited or no repairs to sampling locations unless it creates a safety hazard. • Matrix may make assumptions regarding materials that are deemed unsafe for destructive sampling which includes but may not be limited to live electrical equipment, flange gaskets to active pipes and areas not safely accessible (i.e., significantly damaged roof areas). • Matrix does not anticipate the need for ariel lifts or entering permit required confined spaces. • It is estimated that the asbestos survey will take 4 certified Matrix employees 3 field days to complete the field work. The Hazardous Building Materials Survey will take approximately 3-4 weeks to produce once the investigation is complete. • This proposal does not include testing for lead-containing paint, polychlorinated biphenyl (PCB) containing caulk/sealants, mold, or other potentially hazardous building materials. • This proposal does not include a fee for design phase services, onsite project oversite or air sampling analysis services. Matrix can provide a fee for these services, if requested. • Costs do not include the investigation or samples of any other AOCs. • Costs associated with samples that are analyzed will be charged. Samples that are placed on hold and not analyzed will not be billed to client. • Costs do not include additional sampling or oversight activities other than those outlined in this proposal. • Costs do not include future investigations or remediation. • All work will be conducted under our standard terms and conditions. • All external costs will be charged at cost plus 15%.

File revisions (1)