Supporting Documentation · Mar 25, 2025
2910-25 - 2025 Various Capital Improvements - West Orange (DOT Grant - No DP) (CDBG- down payments) (3_25)(95178364.1).pdf
6e4048f6c0708110d445657d3a1564f528709ee497f6e3fd9b3b256148341401Indexed text · page 3
Show all pages3 #95178364.1 168182.012 Description Appropriation Authorization Down Payment Useful Life Walker Road, South Valley Road, and Rooney Circle, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $1,000,000 DOT Grant) (iii) Improvements and repairs to the entire lengths or portions of, as applicable, Morris Road, Sussex Road and Hunterdon Road, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $ 1,700,000 (including the $517,907 DOT Grant) $ 1,182,093 $ 0 10 years (iv) Improvements and repairs to the entire lengths or portions of, as applicable, South Valley Road, Union Street, Nassau Street from South Valley Road to Township limits and Wheatland Avenue, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $ 2,510,000 (including the $950,000 DOT Grant) $ 1,560,000 $ 0 10 years (v) Improvements and repairs to the entire lengths or portions of, as applicable, Helen Avenue, Lawrence Avenue, Florence Place, and Lowell Avenue, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $ 2,000,000 (including the $498,984 DOT Grant) $ 1,501,016 $ 0 10 years (vi) Improvements and repairs to the Lando Parking Lot, including, but not limited to, milling, paving, line painting, striping, signage, new curbs, base repair and driveway aprons; $ 425,000 $ 405,000 $ 20,000 10 years (vii) Purchase and installation of calming measures, including, but not limited to, signs, striping and LED high visibility lights along Kelly Drive; $ 75,000 $ 72,000 $ 3,000 7 years (viii) Improvements and repairs to Dogwood Drive at Boland Park including, but not limited to, milling, paving, line painting, striping, signage, new curbs, base repair, and driveway aprons; $ 85,000 $ 81,000 $ 4,000 10 years (ix) Exterior improvements and building and grounds improvements along Rooney Circle; and $ 2,000,000 $ 1,905,000 $ 95,000 15 years
File revisions (1)
- Sep 29, 2026
6e4048f6c070200,770 bytes