37 seasonal high-water table, then a soils report shall be submitted. The soils report shall be based on onsite boring logs or soil pit profiles. The number and location of required soil borings or soil pits shall be determined based on what is needed to determine the suitability and distribution of soils present at the location of the control measure. 7. Maintenance and Repair Plan The design and planning of the stormwater management facility shall meet the maintenance requirements of § 25-29.12. 8. Waiver from Submission Requirements The municipal official or board reviewing an application under this ordinance may, in consultation with the municipality’s review engineer, waive submission of any of the requirements in § 25-29.9c1 through § 25-29.9c6 of this ordinance when it can be demonstrated that the information requested is impossible to obtain or it would create a hardship on the applicant to obtain and its absence will not materially affect the review process. § 25-29.11— Requirements for a Site Development Stormwater Plan – Minor Development A. Submission of Site Development Stormwater Plan 1. Whenever an applicant seeks municipal approval of a minor development subject to this ordinance, the applicant shall submit all the required components of the checklist for the site development stormwater plan at §25-29.11C below as part of the submission of the application for approval. 2. The applicant shall demonstrate that the project meets the standards set forth in this ordinance. 3. The applicant shall submit a complete electronic copy, and three hard copies of the materials listed in the checklist for site development stormwater plans in accordance with §25-29.11C of this ordinance. B. Site Development Stormwater Plan Approval. The applicant's Site Development project shall be reviewed as a part of the review process by the municipal board or official from which municipal approval is sought. That municipal board or official shall consult the Township Engineer to determine if all the checklist requirements have been satisfied and to determine if the project meets the standards set forth in this article. C. Submission of Minor Development Stormwater Plan The following shall be required: 1. Boundary Survey of the property to scale within 5 years of the proposal;

File revisions (1)