Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2025

132-25 Gregory Ave-Orange Heights Ave Crosswalk Study.pdf

Preserved file SHA-256b76228b9fb7ddb5117ce7927619025d8ef6a134b95ab9bfb97ddd46dec4b28ee

Indexed text · page 3

Show all pages
Page 3

Crosswalk Analysis Gregory Avenue & Orange Heights Avenue Project No.: 240344 March 21, 2025 Page 3 of 6 70 South Orange Avenue, Suite 109 PO Box 99 Livingston, New Jersey 07039 Roseland, NJ 07068 C: (732) 236-7557 T: (973) 228-0999 F: (201) 753-3904 BrightViewEngineering.com SIGHT DISTANCE Gregory Avenue at intersection with Orange Heights Avenue We performed a stopping sight distance analysis for Gregory Avenue at the study intersection. This analysis was performed per the standards set forth within the 2018 AASHTO - A Policy on Geometric Design of Highways and Streets (The Green Book). Gregory Avenue has a 25 MPH posted speed limit. Based on Table 3-1 of the AASHTO standards, a design speed of 30 MPH (5 MPH over the posted speed limit) with a leveled terrain will require a stopping sight distance of 200 feet. Figure 1 – Stopping Sight Distance – Gregory Avenue From the analysis, we observed that there is adequate stopping sight distance for vehicles on the major-road (Gregory Avenue) to stop for a proposed crosswalk. ORANGE HEIGHTS AVENUE GREGORY AVENUE

File revisions (1)