Show all pagesJuly 2024 Maximum Hourly Rate $124.00 $108.50 $104.00 $103.00 $75.00 $44.00 $101.00 $56.00 $75.00 $77.50 July 2024 Average Hourly Rate: $107.72 $94.35 $79.57 $66.22 $47.61 $37.80 $75.10 $45.16 $75.00 $77.50 Preliminary Design Escalation Rate 1.030 1.030 1.030 1.030 1.030 1.030 1.030 1.030 1.030 1.030 Preliminary Design Maximum Hourly Rate : $127.72 $111.76 $107.12 $106.09 $77.25 $45.32 $104.03 $57.68 $77.25 $79.83 Preliminary Design Hourly Rate : $110.95 $97.18 $81.96 $68.21 $49.04 $38.93 $77.35 $46.51 $77.25 $79.83 Escalation 3% per year, 1 year June 24, 2024 (Revised August 20, 2024) Title Project Manager Senior Engineer Project Engineer Engineer Junior Engineer Senior Tech Technician Landscape Architect Prof. Surveyor Associate Engineer NJDOT Transportation Alternatives (TAP) Design Assistance Program TAP - 2023 - Washington Street Corridor Improvement Project Phase 2 Township of West Orange, Esesx County PRELIMINARY ENGINEERING FEE SUMMARY
File revisions (1)
- Sep 29, 2026
f6e4cbe69a9e2,141,753 bytes