Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2025

133-25 03 Consultants Design Services Cost Proposa West Orange Streetscape Phase 2 PE Proposal 8-20-2024.pdf

Preserved file SHA-256f6e4cbe69a9ea2ec253f8454ff1042136e31e961612cb84ffadff4ddb19d6502

Indexed text · page 8

Show all pages
Page 8

TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange Page 8 of 8 • Hazardous waste investigations and studies, if necessary, are to be performed by NJDOT and therefore not included in this scope of services. • A Design Exception Report is not required and therefore preparation of the same is not included in this scope of services. • Modifications will not be required to the existing roadway profile or roadway cross slopes. Roadway improvements will be limited to the curb relocation and associated pavement repair strip. • As this is a Township led project, we do not anticipate the need to establish utility funding and therefore this activity is not included in this scope of services. • Wayfinding is not included in the project scope. • Driveway widths and locations will not be modified. • CADD drawings and design will be produced in AutoCAD C3D. Cost Estimate – A copy of the proposed costs for the aforementioned services is attached. We would be happy to discuss this scope of services with you, at your convenience. Thank you for the opportunity to provide professional engineering design services to the Township of West Orange. Sincerely, Greenman-Pedersen, Inc. Andrew Cangiano, PE, CME Director of Engineering -Morris Plains Office 301 Gibraltar Drive Suite 2A Morris Plains, NJ 07950 Phone: 973.434.8349 Email: acangiano@gpinet.com

File revisions (1)