Supporting Documentation · May 6, 2025
2911-25 Capital Ordinance (NJDCA Grant) 2025 - West Orange (4.8.25).doc.pdf
820ca5db120cf99a80373e0f8b2c576f91b4fc830a80ec84a77055dae729c731Indexed text · page 6
Show all pages#95178331.1 168182.012 TOWNSHIP COUNCIL OF THE TOWNSHIP OF WEST ORANGE PUBLIC NOTICE NOTICE OF ADOPTION OF CAPITAL ORDINANCE The capital ordinance, published in its entirety herewith, has been finally adopted by the Township Council of the Township of West Orange, in the County of Essex, State of New Jersey (the “Township”) on April 8, 2025. The purpose of this capital ordinance is to appropriate $1,000,000 received or expected to be received from a grant provided by the New Jersey Department of Community Affairs – Coronavirus State Fiscal Recovery Fund to pay for various improvements and upgrades to (i) the Oskar Schindler Performing Arts Center including, but not limited to, the installation of a sound system for the amphitheater, a shed, the installation of ADA accessible seating, and the installation of safety lighting on the building, stage flooring and security cameras, and (ii) Crystal Lake, including, but not limited to, the construction of two floating docks . Said improvements or purposes shall also include, as applicable, all work, materials, equipment, engineering, design, consulting work, preparation of plans and specifications, permits, bid documents, conducting and preparation of reports and studies, environmental investigations and remediation, equipment rental, labor and appurtenances necessary therefore or incidental thereto. ___________________________________ KAREN J. CARNEVALE, Clerk of the Township of West Orange Deleted: bleachers Deleted: re Deleted: an asphalt pathway around the lake and retrofitting certain storm drain inlets along drains in the vicinity of the
File revisions (1)
- Sep 29, 2026
820ca5db120c155,564 bytes