The inspection team and RC will make sure that all the environmental commitments and/or permit requirements are met. They will also verify that all required Civil Rights notices are posted at a location visible at the project site and documents this in the daily inspection reports. The maintenance and traffic control plan impacting work zone and pedestrian safety must be in compliance with the MUTCD and reviewed by the resident engineer on a daily basis. The Contractor will be immediately notified to correct any discrepancies to the approved plan or supplement accordingly. A record of this daily inspection must be included on the daily report. The inspection team shall ensure that all the pedestrian facilities constructed in accordance with Section 504 of the Rehabilitation Act of 1973 and Title II of the ADA Act of 1990 and in accordance with AASHTO standards and Americans with Disabilities Act, Accessibility Guidelines (ADAAG). The inspection team, under RC/PM supervision, monitors and requests corrections from the Contractor as needed of the progress schedule, Contractor payments and contract completion to make sure full adherence to the approved schedule and specified contract time. The inspection team shall monitor and verify that the DBE/ESBE goals identified in the bid documents on the approved Form CR-266-Schedule of DBE Participation for the project are met. The inspection team verifies and ensures that the work to be performed by DBE Sub-contractors is being performed by the approved DBE Firms listed on the Form CR-266. The Resident Engineer will use the daily reports to document the on-site monitoring. Any changes to the DBE Goals or Contractors must be submitted to NJDOT on revised Form (CR-266) for approval. Section 108.01 of the NJDOT specifications must be followed. The RC/PM submits to NJDOT the following documents monthly and/or with Partial Payment Request (Invoice): a. b. c. d. e. f. Form DC-126 - Wage Rate Inspection Form DC-127- Monthly Summary of Contractors Payrolls Form 347 Statement of Compliance and Certified Payrolls Form CR-267 -Monthly Report, DBE Utilization Proof of payment to all subcontractors (DL-72) Cancelled checks as proof of payment for DBE subcontractors The RC/PM and the RE ensures that the Contractor and his sub-Contractors submit the CC-257 electronically each month. Copies shall be submitted to NJDOT-BLA Office

Page 25

f of payment for DBE subcontractors The RC/PM and the RE ensures that the Contractor and his sub-Contractors submit the CC-257 electronically each month. Copies shall be submitted to NJDOT-BLA Office with each payment voucher. 5.2 Source Documentation Township of West Orange complies with Title 23 CFR 635.123 to provide for adequate assurance that the quantities of completed work will be determined accurately and on uniform basis. All related source documents upon which payment is based must be matter of record, as basis for the determination of acceptable pay quantities and monthly payments to the Contractor. The means and methods consisting of notes and/or daily reports for the documentation of length, width, depth and slope, calculations of area, volume, weights, sketches must be presented by the Resident 25 | P a g e

File revisions (1)