Show all pagesthat the progress schedule is not been met. Liquidated Damages or any other penalties proposed will be assessed from the original grant amount shown in the agreement. Progress Schedules The RC/PM with the assistance of the Resident Engineer reviews progress schedule and monitors the contract progress to evaluate impacts to contract time in accordance with Section 153 of NJDOT Standard Specifications. Progress payments are compensation for value of work performed during a covered period as specified in Title 23 CFR 635.123. The RC/PM monitors and documents the project’s progress, Contractor payments and contract completion to ensure compliance to the approved project schedule and contract time. The RC will notify NJDOT-BLA of any changes to the progress schedule as soon as changes are known. 6.1 Final Inspection Requests for final inspection and acceptance to NJDOT-BLA shall be made by Township of West Orange no later than 30 days following Substantial Completion of construction. The RC/PM notifies NJDOT-BLA in writing that the project is substantial completed, once all the pay items have been completed, giving the date the last item was completed. The Resident Engineer, the Design Consultant (if retained), and the RC/PM in the presence of the Contractor will perform the pre-final inspection once all the pay items of the project have been completed. The Resident Engineer will provide the Contractor with a punch list of items to be corrected. The RC will schedule an inspection with NJDOT-BLA. NJDOT-BLA will inspect the project site along with the RC/PM and Resident Engineer/Inspector and inform Township of West Orange of any necessary corrective action required in writing. The RC/PM will notify the NJDOT-BLA in writing after the Contractor has corrected the work included in the punch list and the corrective action list developed by the Resident Engineer/inspector and NJDOT-BLA. NJDOT-BLA, the RC and RE will perform the final inspection and if Township of West Orange and NJDOT-BLA deem all the work acceptable, and once the final inspection letter has been received from NJDOT-BLA, the RC/PM will begin preparing the final change order (if required), final payment, as-built quantities and all other documentation required for final payment and closeout. 32 | P a g e
File revisions (1)
- Sep 29, 2026
e40bc35b39e115,491,232 bytes