Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 24, 2025

157-25 Exhibit.pdf

Preserved file SHA-256e40bc35b39e121949f5c63d295dd8a2a0a65cca9e946c1314eb31086134e97bc

Indexed text · page 48

Show all pages
Page 48

Rev. 10/1/2018 Limitation Of Liability: The TOWNSHIP OF WEST ORANGE assumes no liability for any cost incurred by Proposers in responding to this RFP or in responding to any further requests for interviews, additional information, etc. prior to the issuance of the contract document. TOWNSHIP OF WEST ORANGE's Responsibilities: The TOWNSHIP OF WEST ORANGE shall do the following: Designate the following person to act as the TOWNSHIP OF WEST ORANGE's representative with respect to the services to be rendered under the contract. Such person shall have complete authority to transmit instructions, receive information, interpret and define TOWNSHIP OF WEST ORANGE'’s policies and decisions with respect to the Engineer's services for the project. , TOWNSHIP OF WEST ORANGE Engineer TOWNSHIP OF WEST ORANGE Division of Engineering ADDRESS Furnish to the Engineer, subject to availability and applicability the following information: Existing Plans and Specifications for the project; Furnish a typical sample of the appropriate TOWNSHIP OF WEST ORANGE “boiler plate” forms and documents as may be required during the project. Arrange for access to and make provisions for the Engineer to enter upon public property owned by the TOWNSHIP OF WEST ORANGE. Conduct the pre-construction conference. Attend construction progress and other job related meetings and substantial completion inspections and final payment inspections. Through the TOWNSHIP OF WEST ORANGE Engineer, issue a certificate of substantial completion and certify that the construction work has reached final completion and is ready for final payment. Periods Of Service: Pursuant to NJSA 40A:11-15(9), the Engineer's obligation to render services shall begin at the notice to proceed and start with attendance at the pre-construction conference and extend through the utility relocation phase, construction, punch-list work, final payment authorization, and final close-out of the project in accordance with the construction project schedule. Any modifications must be approved by the TOWNSHIP OF WEST ORANGE. The consulting engineering services called for in these General Conditions and in Detailed Scope of Services shall be completed within the stipulated and/or proposed time periods indicated. Failure to provide the contract services within the stipulated time General Information Page4

File revisions (1)