Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 24, 2025

157-25 Exhibit.pdf

Preserved file SHA-256e40bc35b39e121949f5c63d295dd8a2a0a65cca9e946c1314eb31086134e97bc

Indexed text · page 57

Show all pages
Page 57

Work item details: Local Public Agency: TOWNSHIP OF WEST ORANGE, NJ Project Location: XXX Section XXX From XXX to XXX (XXX) Federal Project Number: XXX Project Phases Included: Project Description: Construction Engineering/Inspection Sek He ***Edit the Following as needed*** The TOWNSHIP OF WEST ORANGE's proposed work 6. will begin XXX of XXX (Station XXX) and the XXX terminus of the project is XXX of XXX (Station XXX). The proposed highway improvement work will be in-kind within the existing right-of-way, and will consist of: The roadway will be milled and resurfaced within the project limits and width of roadway pavement. (The existing concrete curb limits will be maintained throughout.) The roadway centerline will be reprofiled to provide for an appropriate cross slope and centerline grade. Traffic signage will be replaced and added throughout the entire length of the project, as applicable. Traffic striping and markings will be placed on the new roadway pavement, as appropriate. Raised pavement markers will also be installed. Drainage structures throughout the project will be upgraded, reconstructed or replaced, as applicable. If needed, in kind replacement of existing curb. Estimated Construction Amount: $ XXX Funding: Federal Funding involved forl 00% Construction and Civil Engineering/Inspection Term of Contract: DBE goal: eR HCA ok Foe Until project completion XX.X% Required NJDOT Cost Basis Approval: Construction Engineering and Inspection RFP Requirements Page 6

File revisions (1)