Show all pagesn. Along with the RE, reviews and approves the Material Questionnaire and submits to NJDOT-BLA. Reviews and approves any changes to Materials and submits revised Material Questionnaire to NJDOT-BLA. o. Oversees Construction Contract Administration and Construction Inspection with responsibility to provide final decisions on all issues related to the contract as recommended by the RE and/or design consultant. p. Visits and reviews the project site on a frequency appropriate to the complexity of the project and maintains a record of these visits. q. Monitors the work zone safety and traffic control and provides comments and revisions to the Resident Engineer/Inspector for immediate action by the Contractor. Maintains familiarity of day-to-day project operations, including project safety issues. At a minimum the RC/PM, requires and confirms that the Resident Engineer does a daily check of the maintenance and protection of traffic control to ensure it is set up as established on the bid documents and requests the Contractor to resolve any nonconformance issues found. r. Directs project staff, Township of West Orange or consultant, to carry out project administration and contract oversight, including daily entries documenting all project work. s. Ensures that the project receives adequate supervision and inspection to ensure that work is accomplished in conformance with approved plans and specifications. t. Verifies Source Documents related to material testing, material certifications, delivery tickets, daily inspection report, DBE/Trainee participation, project completion, project schedules, Buy America and Build America is strictly controlled by the Resident Engineer / Inspector (retained consultant or agency staff). This is to be done under direct supervision of the RC/PM to ensure that all records are properly maintained for the duration of the project. (See sections 5.2, 5.3 and 5.4 for additional information on Source Documentation) u. Along with the Resident Engineer, monitors sampling/testing of materials for compliance with mandated requirements. Makes provisions for testing by a certified material testing firm. Material used that does not pass required tests, will be rejected, and shall be replaced at no cost to Township of West Orange. v. Makes and/or participates in decisions about changed conditions or scope changes that require change orders or
tests, will be rejected, and shall be replaced at no cost to Township of West Orange. v. Makes and/or participates in decisions about changed conditions or scope changes that require change orders or supplemental agreements. Immediately notifies NJDOT-BLA of any changes to the project. w. Monitors contract time, originally set by the contract documents by comparing the initial construction schedule with progress schedules during construction. Requests for Time extensions, will be evaluated, commented and/or approved and submitted to NJDOT for acceptance as soon as the need for additional time is known. 6|Page
File revisions (1)
- Sep 29, 2026
e40bc35b39e115,491,232 bytes