Supporting Documentation · Jun 24, 2025
164-25 Resolution- Funds for Emergency Storm Sewer Outfall Repairs and Permitting at Hutton Lafayette Apartments.pdf
adfb7af85e01b9c44011990352a95aaaea3db62132a557a44557b4390b2b6addIndexed text · page 1
Show all pages164-25 June 24, 2025 R E S O L U T I O N WHEREAS, On November 25th, 2024, Colonnelli Bros. Inc. was authorized for the emergency repair of the two (2) stormwater outfall that warranted immediate repair at Hutton Lafayette Apartments by resolution No. 324-24 a contract in the amount of $300,000.00; and WHEREAS, an Emergency Authorization to conduct the repairs was obtained on August 7th, 2024 via email by NJDEP; and WHEREAS, the Municipal Engineer authorized Colonnelli Bros., Inc. to subcontract Colliers Engineering and Design from Mt. Arlington to conduct a partial boundary and topographic survey, preliminary constructions plan for submission to the New Jersey Department of Environmental Protection (NJDEP); WHEREAS, a formal application for Flood Hazard Area Individual Permit and Freshwater Wetlands General Permit No. 11 was submitted to the NJDEP in December 2024 and a deficiency letter was receipt on January 15, 2025 from NJDEP; WHEREAS, Colonnelli Bros. Inc. and Colliers Engineering Design worked together to address the deficiency items; WHEREAS, $46,473.70 from Resolution No. 324-24 is to be used to paid a portion of the final invoice for this emergency work; and WHEREAS, additional funds are needed for this work in the amount of $184,797.05; and WHEREAS, the Municipal Engineer by letter dated June 16th, 2025 recommends paying Colonnelli Bros., Inc. invoice submitted and dated February 4, 2025, for the additional cost to address and satisfy NJDEP comments and its associated improvements in the total amount of $231,270.75; and WHEREAS, sufficient funds exist for this work; and WHEREAS, the Township Council concurs in the foregoing.
File revisions (1)
- Sep 29, 2026
adfb7af85e0127,965 bytes