Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 22, 2025

178-25 Invoice.pdf

Preserved file SHA-256fa9cc41f8bc2749ba7b8725cc9336e017ab186e07a98c132acbef96e8f6d8264

Indexed text · page 4

Show all pages
Page 4

13VH0153 3600 DCA -1-800*-242-5846 Shauger Property Services, Inc. 429 DODD STREET EAST ORANGE, NJ 07017 Voice: Fax: Sold To: 973-676-2100 973-676-8200 TOWNSHIP OF WEST ORANGE DEPT. OF PUBLIC WORKS 25 LAKESIDE AVENUE WEST ORANGE, NJ 07052 Attn: ZAYIBETH CARBALLO RE: TOWNSHIP OF WEST ORA Job Number: Invoice Invoice Numbe E-113583 Invoice Date Jun 30, 2025 Page: 4 Customer PO | Payment Terms ; Due Date Sales Rep ID 80223 Net 15 Days 115/25 Quantity Description Unit Price Extension | POLYETHYLENE (HDPE) STORM PIPE, RUNNING FROM THE MANHOLE ON ROONEY CIRCLE TO THE MANHOLE LOCATED IN THE CAMBRIA HOTEL PARKING LOT A PORTION OF THE NEW STORM LINE WAS BORED AND SLEEVED TO ALLOW SAFE CROSSING BENEATH EXISTING INFRASTRUCTURE. THE SLEEVED SECTION WAS FULLY ENCASED IN FLOWABLE FILL CONCRETE MIX TO ENHANCE STRUCTURAL INTEGRITY AND PREVENT FUTURE SUBSIDENCE OR COLLAPSE. ONCE PIPE INSTALLATION WAS COMPLETED, SHAUGER BACKFILLED THE TRENCH USING CERTIFIED DENSE GRADED AGGREGATE (DGA) MATERIAL IN 3-FOOT LIFTS. AFTER BACKFILLLING TO 8 INCHES BELOW FINISHED GRADE, THE REMAINING TIMBER SHORING WAS REMOVED AND THE TRENCH WAS PAVED WITH ASPHALT BASE COURSE TO MATCH GRADE WITH NEW 18-INCH HDPE STORM PIPE TO INCREASE CAPACITY AND IMPROVE SYSTEM DURABILITY Total Invo! Subtotal Sales Ta) ice Amou Check No Payment Receive TOTAL Continued Continued Continued 0.00 Continued

File revisions (1)