are Categorical Exclusion Document (3870): GP! anticipates completing Sections | and II of the Categorical Exclusion Document and submitting the same to NJDOT Local Aid who will forward it to BEPR for completion. GP! will provide a shapefile (.shp) delineating the limit of disturbance (LOD) for the project, along with a separate shapefile encompassing the LOD and each parcel directly adjacent to the project. Additionally, GP! will provide BEPR with a summary detailing the necessity and locations of all new impervious surfaces and new ground disturbances, as well as permanent and temporary impacts associated with the project. GPI recognizes that this task typically requires a long lead time for the NDOT BEPR unit to finalize and therefore will make every effort to complete the required documentation early in the PE Phase to mitigate any potential delays. The grant name will be used as the name of the project in the CED. PE Assumptions: The following general assumptions are in addition to those stated in the previous activity descriptions for this task order: e Proposed streetscape improvements will be located within the right-of-way. Authorization to perform work outside the right-of-way will be provided in Right-of-Entry (ROE) documents signed by property owners, obtained during FD. e The required CED will be prepared by NJDOT BEPR with input from GPI on Sections | and II. e A Cultural Resource Study Phase IA is not included in this scope of services. Any coordination with the NJDEP to secure permits or approvals requiring a Phase IA will be conducted by NJDOT BEPR and SHPO. e Green Acres coordination, if required, will be conducted by NJDOT BEPR and NJDEP. Page ; - GPI

Page 26

Exhibit A Page 25 of 66 TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange Hazardous waste investigations and studies, if necessary, are to be performed by NJDOT and therefore not included in this scope of services. A Design Exception Report is not required and therefore preparation of the same is not included in this scope of services. Modifications will not be required to the existing roadway profile or roadway cross slopes. Roadway improvements will be limited to the curb relocation and associated pavement repair strip. As this is a Township led project, we do not anticipate the need to establish utility funding and therefore this activity is not included in this scope of services. Wayfinding is not included in the project scope. Driveway widths and locations will not be modified. CADD drawings and design will be produced in AutoCAD C3D. Cost Estimate — A copy of the proposed costs for the aforementioned services is attached. We would be happy to discuss this scope of services with you, at your convenience. Thank you for the opportunity to provide professional engineering design services to the Township of West Orange. Sincerely, Greenman-Pedersen, Inc. LK S52 Andrew Cangiano, PEYCME Director of Engineering -Morris Plains Office 301 Gibraltar Drive Suite 2A Morris Plains, NJ 07950 Phone: 973.434.8349 Email: acangiano@gpinet.com

Page 27

[ezzer‘ssts I 1301 pueio) (lesodoud sy paysene eas) [ex ezb'thS [ (24a) sai}:squeqnsuooqns 9S°E96'ETTS 1301 149) 00°00S$ ‘asi / aBe3s0q / BU)IULJd| Q0'00S$ Aes ‘aS'Z0S$ =29'0$ x SalIU OZ Jo :adeaLW “E 00°005$ aseaiin| “bZ02/TO/LO J0 Se ase sayei AUNOH “7 6268885 ToqeT %S zz) 84 PAXly| “paysi| ated Ajunoy aesane ayy mojaq 40 anoge aq Aew pue pajig aq 65°€95'b9S peayIAAG TEST x4 {iim 29afo1d 343 Uo BuN10M s|enpinipu! Jo Sayed ANOY jeMaW “T BTOTS'6eS J0g21 T810N BEOTS'6ES gtvyzs | os'esa'ts | es'pse'os [eorege'os | zttte'rs | og'yso‘ots | oz‘zae’es | os T88"rs i$ 12304, 729 oT vr vor aid ZL et ov ww [SanOH [e}0L cesor'es 9E 0 3 0 Eid z v 0 0 O9E SpueaMm areaulied es ete TS (4 0 0 g oO a 9 v z OL8E quauind0g wolsniaxa jesHOHaIeD aledalg SS'ETS'zS 98 v 0 0 ot 0 8 0 8 S98 Joqu3) vOReUHOWU 3yqNd PIOH| Be TRSs a 0 oO 0 v 0 z 0 z S0zé woday 3d YeIG SmaINDY LOGIN 8 GIYSUMOL| 99'86E'eS ze 0 0 0 8 g 8 9 z Oste wodey 34 yeid auedaig ETarazy a 0 0 0 8 oO v 0 o SELE ‘ayeu|sq ISO UOI}INISUOD Biedaig [2'o2e'Ts ve 0 0 oT 9 3 v 0 z Ca ‘sue|d 8u/8eIs uONSNaSUOD / nog AreuIMN|aJe AepdN] oveeces 0s 0 0 az 81 0 8 z z SITE Ueja DedUT MOY ARI] 78° 69'TS EI4 i) 0 oT i?) i¢) 8 z z O60E su011e90] AW/9e4 Fuesu!Fuy Iyjes | BulWEJaq| eS Esy'ys we 0 0 oT oz oT a 9 z S80E uBisaqg aBeujeig Meujwijeid e4edeig} fee tO'zs 82t 8 8 ov Ed oz oT 9 z OLE Suejg Aempeoy Areuiunijeag ssedaag| [g2"299'TS 82 0 0 EG 0 0 8 v 0 SOE ‘321 4U0 Auap| pue sue|d aseg aIepaN| Baa Z v 0 y 0 0 = 0 0 SOE 7ayo7 enbsy UORETyLOA AIAN PUES| fer 99S oT 0 0 OL 0 0 0 0 SE0E Sue|g 85ea AUINN aledald aeves'es ts 0 0 (4 0 ST 8 8 z O80E TawWOaS [eDMaA puke [eIWOZUOH aredd1q joo'ozes 8 0 0 9 0 z 0 0 0 Sz0€ sdew aseg auedaig| SLES 9 0 C) z oO z 0) oO z OzoE ‘Aaains diydesdodo | Janpuo5| pa Lzes v 0 0 0 0 a v 0 0 STOE uodey jonu05 Aaning suedeid| By ze ys Sv 0 0 0 0 0 Z z oT : UoReUIpIOOD pue Buynpsyss juaWeBeUe 198/014] 1s9v$ SELLS £6°8ES ‘v0'60S 1z'89$ 9618S 8T°L6$ S6OITS reqey AynoH aBesany yer, | SoH [aes [coors | zesvs seus | soot | erzors | szttis | eccers Faveu AunoH winuncey aeeujgug | se0ulsug weeulgug | seeugug | seseuey ypal so1uas saauysug : sown | ayersossy ypaloid so1uas afoid 99 Jo 97 a8eg V NQIXG (z0z ‘02 1snGiny pasinay) ¢z0z ‘bz oun AUVINWNS Fd ONPETINIONT AUVNIAITINd Z aspyd Waloig Juawaaosduy 10p1L4109 134.05 uoBuiysyM - €Z0Z - dV.L wo16o.1g auvisissy uBisaq (dV) wos6o.1g saanpusaqy uoDz10dsuv.y

Page 27

2 1snGiny pasinay) ¢z0z ‘bz oun AUVINWNS Fd ONPETINIONT AUVNIAITINd Z aspyd Waloig Juawaaosduy 10p1L4109 134.05 uoBuiysyM - €Z0Z - dV.L wo16o.1g auvisissy uBisaq (dV) wos6o.1g saanpusaqy uoDz10dsuv.y LOGIN aBuns9 sayy fo drysumoy

Page 28

JeeA T Weak sad %E UO!E|22S3 €8°6LS SELLS £6°8ES p0'6b$ TZ'89$ 96°T8$ BT'L6$ ‘SG OTTS TaIey AUNOH usisog AeUIUITald E8°64S €0°V0TS ZE°SbS SCLLS 60°90T$ @U'Zors OLTELS @LLets: Fayey ALNOH wWNnuxe,] UsIseq Areunut|aid| OEOT O€OT ‘OE0T O€OT OEOT O£0T OE0T OEOT ‘Bley UOe|edsg Usiseq AIEUTUN|Old OSLLS Or'ses O8'Zes T9Lb$ 22'99§ LS°6L$ SEES ZLLOTS raqey AUNOH edeseny p207 Aint] OS"LLS Qa'LOTS 00'rrsS o0's$ 00"E0TS Qo"vOTS Os"80T$ on'vets ayey AynoH wnuixew yo Aint] aoKenans yeaugug | se0uduy qaouug | seoudug | sodeuew. i, yaa sowas, saauysug ap Jo1d | adeaspuey sone | ayepossy paloid soma paloid 99 Jo LZ aded y UIqIyXa Z aspyd Jaal01g Juaulaaosduly JOp1410) 339.195 UOJBUIYSDAA - EZOZ - dV. wips6o.tg aaupisissy uBisag (dV.L) Saayousa}]y uonDJ40dsuD., LOGIN (ez0z ‘oz asnBny pasinay) ¢z0z “¢z aun{ AUVINWNS Add ONTATINIINA AUVNUNITANd Aquno) xsasyq ‘aBuv.ig ysam Jo diysumo,

Page 29

mfsengineerscom Exhibit A Page 28 of 66 MF ENGINEERS & SURVEYORS 2 August 2024 Lenin S. Cruz, P.E. Project Engineer Greenman-Pedersen, Inc. 301 Gibraltar Drive, Suite 2A Morris Plains, NJ 07950 Proposal for Preliminary Engineering (P.E.) Professional Land Surveying Services NJDOT TAP 2023 — West Orange, Washington Street Corridor Improvement Project Phase 2 Located in the Township of West Orange, Essex County, New Jersey (MFS Proposal No. NJ24060.001R1) Dear Lenin, MFS Consulting Engineers & Surveyor, DPC (MFS) is pleased to submit this proposal to provide professional land surveying services to support the Preliminary Engineering (PE) Phase for the TAP 2023 West Orange Washington St. project. The following proposal briefly discusses our project understanding and scope of work. PROJECT UNDERSTANDING To support the TAP 2023 West Orange Washington St., MFS shall perform the following NJDOT PE Activities. 1. Activity 3015 — Prepare Control Survey Report 2. Activity 3020 — Conduct Topographic Survey 3. Activity 3025 — Prepare Base Maps The services shall include: © — Survey limits to extend 10’ (ft) beyond the Right of Way (ROW). e — Survey to include building faces, steps and building finished floor elevations at doorway thresholds. ¢ Key ground surface features (i.e., top/bottom curb lines, crown of road, ADA ramps, top/bottom utility pads) and other breakline features in addition to random spot elevations. e All visible and accessible surface features (i.e., walks, pads, surface utilities, fences, etc.). e Any existing sub-surface utility mark-out found within the mapping limits. ¢ Establish rim/grate/invert elevations on sanitary and drainage structures within the project corridor. Electrical & telephone manholes or vaults to be located on the surface only. ¢ — Locate any Right of Way (ROW) and/or boundary evidence found while performing the survey. e Establish ROW deed mosaic. Include properties fronting the streets within the project limits, including sidelines and lot lines off the right of way to be shown on a deed mosaic. == New Jersey (Headquarters) ==" New Jersey == New York == Puerto Rico 2780 Hamilton Bivd 24 Kanouse Rd 320 Fifth Ave.. Ste. 1200 103C Isabol Andreu de Aguilar, Ste. 3 South Plainfield, NJ 07080 Newfoundland, NJ 07435 New York, NY 10001 San Juan, PR 00918 Phone 908.922.4622 Phone 9736972122 Phone 212.943.6576 Phone

Page 29

e.. Ste. 1200 103C Isabol Andreu de Aguilar, Ste. 3 South Plainfield, NJ 07080 Newfoundland, NJ 07435 New York, NY 10001 San Juan, PR 00918 Phone 908.922.4622 Phone 9736972122 Phone 212.943.6576 Phone 787998.7436 Fox 8665717413 Fox 973.838.6433 Fax 8665177413, Fox 787765.3691

Page 30

Exhibit A Page 29 of 66 Proposal for Preliminary Engineering (P.E.) Professional Land Surveying Services 2 August 2024 NJDOT TAP 2023 — West Orange, Washington Street Corridor Improvement Project Phase 2 Located in the Township of West Orange, Essex County, New Jersey (MFS Proposal No. NJ24060.001R1) Page 2 of 4 The project limits are as shown in the below image provided by GPI and outlined in red. ACTIVITY 3015 — PREPARE CONTROL SURVEY REPORT Allcontrol establishment activities for the project, including the preparation of control reports shall be in accordance with NJDOT Surveying Manual and Standard Article 44. The horizontal control will be tied to the New Jersey State Plane Coordinate System NAD83 (Grid). The vertical control will be tied to the North American Vertical Datum NAVD 1988. A local project ground datum will be calculated based on the primary survey control. All mapping will be prepared in a Local Project Ground datum. Utilizing GNSS RTN and Leica SmartNet, primary survey control for the project will be established following the specifications provided in the “User Guidelines for Real Time GNSS Positioning”, Version 3.1, dated April 2014 for Class RT1 surveys (Primary Control) having a relative accuracy of 0.01m — 0.02m horizontal and 0.02m — 0.04m vertical at the 95% confidence level. Utilizing the primary survey control stations, a secondary survey traverse baseline will be established originating and closing on the primary control pairs. Benchmarks will be established and staggered between the traverse baseline stations. Differential leveling will be performed to include the secondary traverse baseline stations and benchmarks utilizing the primary control as the reference benchmarks. The horizontal control shall meet or exceed Second Order Class II accuracy standards and the vertical control will meet or exceed Second Order, Class Il accuracy standards. A Survey Control Report will be prepared for the primary/secondary survey control. The report will be signed and sealed by a NJ Licensed Surveyor. The report shall include the computations, analysis, final coordinates, elevations, and diagrams for each of the semi-permanent points set within the project area. ACTIVITY 3020 —- CONDUCT TOPOGRAPHIC SURVEY MES shall utilize conventional surveying methods to perform the survey. Cross sectional data will be obtained at approximately 50’

Page 30

ithin the project area. ACTIVITY 3020 —- CONDUCT TOPOGRAPHIC SURVEY MES shall utilize conventional surveying methods to perform the survey. Cross sectional data will be obtained at approximately 50’ intervals within the project limits. Additional supplemental cross section information will be obtained at driveway edges & centerlines in addition to low/high areas within the project limits. Supplemental locations will be observed at existing ADA ramps and building entrances & stairs. In addition, the survey will include observable and accessible manmade surface features (i.e., surface utility hardware, signs, fences, walls, pads, existing subsurface utility mark out, etc.). MFS will establish rim/grate elevations on sanitary and drainage structures located within survey limits. Invert measurements will be taken and recorded as will pipe types and sizes, MFS will not enter any structures. Structures with excessive debris and/or silt will be noted, MFS will not

Page 31

Exhibit A Page 30 of 66 Proposal for Preliminary Engineering (P.E.) Professional Land Surveying Services 2 August 2024 NJDOT TAP 2023 ~ West Orange, Washington Street Corridor Improvement Project Phase 2 Located in the Township of West Orange, Essex County, New Jersey (MEFS Proposal No. NJ24060.001R1) Page 3 of 4 clean or attempt to remove debris or silt. Non-sanitary/drainage structures will not be opened and surveyed from the surface only. In addition, MFS will survey any ROW/boundary evidence which is found while performing the field survey. ACTIVITY 3025 — PREPARE BASE MAPS The base mapping will be prepared utilizing the survey field data. Planimetric features will be drafted and identified. A Digital Terrain Model (DTM) will be prepared utilizing a combination of breakline features (i.e., curb lines, edge of pavement, walks, top/bottom slopes, etc.) in addition to inlets and other points observed during the field survey. Mapping will be output at 1”=30' using NJDOT’s standard levels, linetypes and cells and formatted in Bentley MicroStation Version V8 in accordance with NJDOT Article 51. A DTM will be prepared in Bentley InRoads from which 1’ contours will be generated. The data delivery will include the DTM surface data for your use. Utilizing a combination of tax maps, NJGIN data and recovered field evidence, MFS will establish the ROW within the project corridor. Properties fronting the streets within the project limits will have sidelines and lot lines off the right of way shown based on a mosaic utilizing tax maps and obtained deeds. Parcel Block and Lot numbers will be shown. DELIVERY ITEMS e — Digital files of all mapping data in Bentley MicroStation V8 to include: © Topographic Mapping e — Striping e Breakline e Contours (1’ contours) e ROW/Parcel Line File e Digital Terrain Model e _ Digital Final Primary and Secondary Control Reports EXCLUSIONS 1. MFS assumes that roadway occupancy permits will not be required. If permits are required, additional fees will be charged. 2. MFS does not anticipate Maintenance and Protection of Traffic (MPT), neither vehicular and/or pedestrian will be required. If MPT is required, additional fees will be charged. Setting of property markers is not included in this proposal. This proposal does not include a subsurface utility investigation being performed by MFS. Services not explicitly described above