Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 12, 2025

188-25 Exhibit A_GPI_WO Agreement Contract.pdf

Preserved file SHA-256c29566122c16f79c08f46bc0d8cb34308d36df25a00ca9218add6c33a8fad493

Indexed text · page 31

Show all pages
Page 31

Exhibit A Page 30 of 66 Proposal for Preliminary Engineering (P.E.) Professional Land Surveying Services 2 August 2024 NJDOT TAP 2023 ~ West Orange, Washington Street Corridor Improvement Project Phase 2 Located in the Township of West Orange, Essex County, New Jersey (MEFS Proposal No. NJ24060.001R1) Page 3 of 4 clean or attempt to remove debris or silt. Non-sanitary/drainage structures will not be opened and surveyed from the surface only. In addition, MFS will survey any ROW/boundary evidence which is found while performing the field survey. ACTIVITY 3025 — PREPARE BASE MAPS The base mapping will be prepared utilizing the survey field data. Planimetric features will be drafted and identified. A Digital Terrain Model (DTM) will be prepared utilizing a combination of breakline features (i.e., curb lines, edge of pavement, walks, top/bottom slopes, etc.) in addition to inlets and other points observed during the field survey. Mapping will be output at 1”=30' using NJDOT’s standard levels, linetypes and cells and formatted in Bentley MicroStation Version V8 in accordance with NJDOT Article 51. A DTM will be prepared in Bentley InRoads from which 1’ contours will be generated. The data delivery will include the DTM surface data for your use. Utilizing a combination of tax maps, NJGIN data and recovered field evidence, MFS will establish the ROW within the project corridor. Properties fronting the streets within the project limits will have sidelines and lot lines off the right of way shown based on a mosaic utilizing tax maps and obtained deeds. Parcel Block and Lot numbers will be shown. DELIVERY ITEMS e — Digital files of all mapping data in Bentley MicroStation V8 to include: © Topographic Mapping e — Striping e Breakline e Contours (1’ contours) e ROW/Parcel Line File e Digital Terrain Model e _ Digital Final Primary and Secondary Control Reports EXCLUSIONS 1. MFS assumes that roadway occupancy permits will not be required. If permits are required, additional fees will be charged. 2. MFS does not anticipate Maintenance and Protection of Traffic (MPT), neither vehicular and/or pedestrian will be required. If MPT is required, additional fees will be charged. Setting of property markers is not included in this proposal. This proposal does not include a subsurface utility investigation being performed by MFS. Services not explicitly described above

Page 31

arged. Setting of property markers is not included in this proposal. This proposal does not include a subsurface utility investigation being performed by MFS. Services not explicitly described above are not included within the scope of this proposal. MFS staff will not enter upon adjacent private property with consent from the property owner. MFS assumes that all fieldwork will be performed during normal business hours Monday to Friday. If fieldwork is required during non-normal business hours, additional fees may be charged. Novae

File revisions (1)