Exhibit A Page 23 of 66 TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange Freshwater Wetlands Protection Act Rules as of the date of this proposal. This proposal does not include work to conform to subsequent rule changes after date of this proposal. 6. Application to NJDEP for Flood Hazard Area (FHA) and NJDEP Freshwater Wetlands (FWW) are excluded from this proposal. Should FHA or FWW permits or verifications be required this work will be included as part of Final Design (FD) phase. Determine Traffic Engineering Facility Locations (3090): GP! will prepare preliminary level plans for the layout of decorative lighting, guide signs and regulatory traffic control devices. The preliminary lighting design will include coordination with the Township and PSE&G to determine the requirements for a PSE&G owned decorative lighting system. GPI will perform a lighting analysis using Visual lighting software to determine the appropriate spacing of the decorative luminaires based on the AASHTO Roadway Lighting Design Guide criteria. It is anticipated that concrete light pole bases and conduits for the PSE&G owned lighting system will be reimbursable construction items. Initiate ROW Impact Plan (3115): The proposed streetscape improvements will be located within the public right- of-way to the extent feasible. The ROW Impact Plan will document any locations where it is necessary for sidewalk improvements to extend outside the right-of-way to meet ADA design requirements. Easements to perform work on private property will be secured with right-of-access agreements obtained during final design. Update Preliminary Detour and Construction Staging Plans (3130): GPI will prepare the preliminary construction staging plans. The plans will be generally schematic in nature. We do not anticipate indicating MPT devices and signs on the plans for this phase. As the work in the project is typically off the roadway, we anticipate construction can be accommodated by typical MUTCD and NJDOT set ups and details. Vehicular detours are not anticipated or included in our scope of work; however, one direction of travel detour during working hours may improve safety within the work zone. While pedestrian detours will be required, temporary signals, modification of existing signals or other electrical work is not anticipated. Prepare Construction Cost

Page 24

rove safety within the work zone. While pedestrian detours will be required, temporary signals, modification of existing signals or other electrical work is not anticipated. Prepare Construction Cost Estimate (3135): GP! will prepare the Construction Cost Estimate using NJDOT Bid information, results from prior similar projects and the plans developed during PE. The Construction Cost Estimate is necessary to properly program construction funds for the project. We will submit the Construction Cost Estimate to the Township and NJDOT Local Aid for review and comment. Prepare Draft Preliminary Engineering Report (3160): GP! will prepare and submit the Draft PE Report for Township and NJDOT review. Washington Street is under County's jurisdiction so the Draft PE Report will also be submitted to Essex County for their review and comment. The Draft PE Report will also be shared with the NJDOT Bureau of Environmental Program Resources (BEPR) to support the review of the Environmental Document. GPI will use the NJDOT PE Report template as a guide for the items to be included in the Draft PE Report, aside from those listed in assumptions below, which are not relevant to the project. Assumptions: The following items normally associated with the Capital Project’s NJDOT PE Report template will not be prepared as a part of Activity 3160, as they are not relevant to the project and not required as per Local Aid Federal project handbook: Design Exception Report Alternatives Analysis Report Complete Streets Checklist Design Communications Report Risk Register Updated Utility Risk Assessment Plan On BE te Oo ee GPI

File revisions (1)