Exhibit B Page 37 of 66 GPI Engineering | Design | Planning | Construction Management June 24, 2024 (Revised August 20, 2024) Zayibeth Carballo, Municipal Engineer Director of Public Works Township of West Orange 25 Lakeside Avenue West Orange, NJ Re: NJDOT Transportation Alternatives Program TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange, Essex County Subject: Proposed Scope of Services and Cost Proposal for Final Design Dear Ms. Carballo Thank you for the opportunity to provide professional engineering design services for the Final Design (FD) phase for the above referenced project. Our scope of services is based on the TA - 2023 Application completed by the Township, input received at our online teams meeting on February 12, 2024, an Essex County Washington Street / Watchung Avenue traffic signal meeting on August 19, 2024, and the NJDOT standard network diagram and activity descriptions for the Final Design. The Township is working to increase pedestrian safety, accessibility and walkability on Washington Street. This Washington Street Corridor Improvement Project Phase 2 will tie in seamlessly to the already initiated 2020 TAP Washington Street Corridor Improvements Project. This project is looking to improve Washington Street from Liberty Street to Meade Street. The length of the project is approximately 739 linear feet or 0.14 miles. Washington Street is a County roadway, and as the project will make improvements to a County road, the Township has secured the approval of the County of Essex for this project. The proposed improvements will include improved crosswalks, signage, new sidewalks and curbs, ADA-compliant curb ramps, detectable warning surfaces, flashing speed limit signs, flashing pedestrian crossing signs, enhanced lighting, street trees, bicycle racks and trash receptacles. These improvements are being made to promote walking and better accommodate pedestrian transit as an alternate travel mode. Deficient curb ramps, concrete driveway aprons and sidewalks will be replaced to conform with ADA requirements. Proposed improvements will be consistent with previously completed streetscape projects by the Township. The intersection of Washington Street and Watchung Avenue is a signalized intersection. Traffic signal and intersection improvements are excluded from this project. Traffic signal and

Page 38

y the Township. The intersection of Washington Street and Watchung Avenue is a signalized intersection. Traffic signal and intersection improvements are excluded from this project. Traffic signal and intersection improvements are to be completed under the Essex County Local Safety Project. Greenmai

File revisions (1)