Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 12, 2025

188-25 Exhibit A_GPI_WO Agreement Contract.pdf

Preserved file SHA-256c29566122c16f79c08f46bc0d8cb34308d36df25a00ca9218add6c33a8fad493

Indexed text · page 39

Show all pages
Page 39

Exhibit B Page 38 of 66 TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange Scope of Services GP! will perform the activities as described within this scope of services. It is understood that these activities will be directed by the Township of West Orange. The activities are more specifically described as follows: Project Management: Scope Development, Budget, Schedule, and Invoicing — GP| will prepare and submit to the Township a baseline schedule in an agreed upon format for approval or comment. We will update the schedule ona monthly basis for the duration of this project. GPI will submit a progress report with each invoice that will detail the following: Y Activities completed to date with the current invoice period highlighted Asummary of the costs incurred to date and the percentage of project complete Confirmation of upcoming submittals and possible scheduling conflicts Any unanticipated cost and/or activities not included in these scope of services Responses required from the Township or NJDOT Local Aid Anticipated work during the next invoice period NNN It is understood that the Township will not process any submitted invoices unless the above information is attached to the same. This activity will also include attending and preparing minutes of one (1) coordination meeting during FD development. FD is expected to be completed in nine (9) months’ time from notice to proceed. The following summarizes the activities associated with this scope of services based on the NJDOT Activity Descriptions Manual and as modified for this specific design assistance project that are to be performed by GPI and our subconsultants: Activity No. Activity Description 4050 Develop Alternatives of Accommodation 4085 Conduct Supplemental Subsurface Utility Engineering 4090 Incorporate Utility Design in Contract Documents 4100 Prepare Jurisdictional Limits Maps and Agreements 4210 Complete Horizontal / Vertical Geometry 4215 Conduct Supplemental Surveys 4220 Prepare Final Roadway Plans 4230 Complete Lighting Design 4240 Complete Traffic Signal, Signing and Striping Plans 4260 Develop Landscape Architectural Design 4270 Complete Drainage Design 4275 Develop Construction Cost Estimate 4280 Develop Specifications 4285 Develop Construction Schedule 4290 Prepare Final Design Submission Package 4385 Prepare Permit

Page 39

70 Complete Drainage Design 4275 Develop Construction Cost Estimate 4280 Develop Specifications 4285 Develop Construction Schedule 4290 Prepare Final Design Submission Package 4385 Prepare Permit Application 4410 Prepare Soil Erosion and Sediment Control Plans GPI

File revisions (1)