ARTICLE 2. PLANS AND SPECIFICATIONS (A) GPIshall prepare, or have prepared, if required by the State, environmental documents, engineering documents, plans, specifications and estimates for the Project and shall submit them to the State for review. A Professional Engineer licensed to practice in New Jersey must prepare the plans and specifications. The State shall review the engineering documents, plans and specifications for conformance to program requirements and design standards. All design work shall conform to the applicable American Association of State Highway and Transportation Officials (AASHTO) design criteria, the current Manual on Uniform Traffic Control Devices (MUTCD), and the NJDOT Bicycle Compatible Roadway and Bikeways Planning and Design Guideline. However, the design of traffic barriers and drainage systems shall conform to the NJDOT and the current version of the NJDOT Roadway Design Manual in effect at the time this agreement is executed. All workmanship and materials shall conform to the Standard Specifications. If there is a deviation from these standards, GPI shall notify the State in writing of any deviation from the standards and shall accept any and all responsibility for any injury and damage by such deviation to any person or property and shall indemnify the State as outlined in this Agreement. A Design Exception shall be executed when it can be documented to the State’s satisfaction that a lesser design value is the best practical alternative. The factors to be considered when determining if a lesser design value should be elected shall include social economic and environmental impacts together with safe and efficient traffic operations. ARTICLE 3. KEY PERSONNEL (A) GPI shall designate Andrew Cangiano as its Project Manager, who shall not be replaced without WEST ORANGE’s consent. (B) WEST ORANGE designates Zayiberth Carballo as its Project Manager. ARTICLE 4. PERFORMANCE SCHEDULE (A) The performance schedule under this AGREEMENT shall begin upon execution of this AGREEMENT and continue for three years, for which period funds are available and allotted. This AGREEMENT is subject to renewal. Costs incurred prior to or after these dates are not reimbursable. This AGREEMENT may be extended by mutual written agreement or terminated under the conditions of this AGREEMENT. All extension requests must be submitted in writing to

Page 4

hese dates are not reimbursable. This AGREEMENT may be extended by mutual written agreement or terminated under the conditions of this AGREEMENT. All extension requests must be submitted in writing to WEST ORANGE at least ninety (90) days prior to the close of the AGREEMENT period. Whenever GPI knows that any actual or potential condition is delaying or threatens to delay the timely performance of this AGREEMENT, GPI shall provide written notice thereof to WEST ORANGE. ARTICLE 5. ALLOWABLE COSTS AND PAYMENTS (A) The cost of Preliminary Engineering services to be provided under this AGREEMENT shall not exceed $155,437.29. A budget agreed to by the parties is attached as parts of Exhibits A, B and C, and made Page 4 of 66 September 2024 TAP Standard Agreement

File revisions (1)