Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 12, 2025

188-25 Exhibit A_GPI_WO Agreement Contract.pdf

Preserved file SHA-256c29566122c16f79c08f46bc0d8cb34308d36df25a00ca9218add6c33a8fad493

Indexed text · page 45

Show all pages
Page 45

Exhibit B Page 44 of 66 TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange Review FDS (4810): GPI will prepare the job training and civil rights goal requests as necessary based on feedback provided by NJDOT Local Aid through the Township to comply with Federal regulations. Resolve FDS Comments (4830): GP! will provide written responses to all FDS comments and ensure all comments are satisfied prior to updating plans and documents for the PS&E submission. Submit PS&E Package (4840): GPI will update the plans and documents as indicated in the FDS comment resolution summary and compile final plans, specifications, estimate, schedule and supporting documents into the PS&E package. GPI will distribute the cover sheet and obtain required signatures as necessary prior to contract advertisement. Assumptions: The following assumptions are in addition to those stated in the previous activity descriptions for this task order: © Modifications will not be required to the existing roadway profile or roadway cross slopes. e Full depth pavement and/or pavement resurfacing will be limited to the narrow strips of pavement removal and replacement necessary to install the proposed curb and ADA ramps. © Drainage design is limited to resolving issues at curb ramps, curb extensions and cross walks. Analysis of existing drainage systems and the correction of existing drainage issues is excluded from this scope. © Final design CADD drawings and design will be produced in AutoCAD/C3D format. e A Cultural Resource Study Phase IA is not included in this scope of services. Any coordination with the NJDEP SHPO to secure approvals requiring a Cultural Resource Study Phase IA will be conducted by NJDOT and SHPO. e Threatened and endangered species survey will be conducted by NDOT BEPR. NJDOT BEPR will handle the required threatened and endangered species coordination and documentation. e Green Acres coordination, if required, will be conducted by NJDOT BEPR and NJDEP. © Hazardous waste investigations and studies, if necessary, are to be performed by NJDOT and therefore not included in this scope of services. © Environmental mitigation is not anticipated and therefore not included in this scope of services © Hydrology and hydraulics for flood plain modeling is excluded. FHAIP Verification will not be required. e Changes to NJDEP Flood

Page 45

ot anticipated and therefore not included in this scope of services © Hydrology and hydraulics for flood plain modeling is excluded. FHAIP Verification will not be required. e Changes to NJDEP Flood Hazard Area Control Act and NJDEP Freshwater Wetlands Protection Act Rules could affect the project scope and work effort. Cost Estimate — A copy of the proposed costs for the aforementioned services is attached. We would be happy to discuss this scope of services with you, at your convenience. Thank you for the opportunity to provide professional engineering design services to the Township of West Orange. Sincerely, Greenman-Pedersen, Inc. AA Ge Andrew Cangiano, P| Director of Engineering -Morris Plains Office 301 Gibraltar Drive Suite 2A Morris Plains, NJ 07950 Phone: 973.434.8349 Email: acangiano@gpinet.com GPI

File revisions (1)