Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 12, 2025

188-25 Exhibit A_GPI_WO Agreement Contract.pdf

Preserved file SHA-256c29566122c16f79c08f46bc0d8cb34308d36df25a00ca9218add6c33a8fad493

Indexed text · page 50

Show all pages
Page 50

Exhibit B Page 49 of 66 Proposal for Final Design (F.D.) Professional Land Surveying Services 2 August 2024 NJDOT TAP 2023 — West Orange, Washington Street Corridor Improvement Project Phase 2 Located in the Township of West Orange, Essex County, New Jersey (MFS Proposal No. NJ24060.002R1) Page 3 of 3 DELIVERY ITEMS e° Updated drawing or reference files in Bentley MicroStation V8 * ASCII point files as needed. EXCLUSIONS 1. MES assumes that roadway occupancy permits will not be required. If permits are required, additional fees will be charged. 2. MFS does not anticipate Maintenance and Protection of Traffic (MPT), neither vehicular and/or pedestrian will be required. If MPT is required, additional fees will be charged. 3. The stakeout of possible test holes was not included in Activity 4085. 4, MFS assumes that GPI will provide any and all reference drawings showing any underground utilities, to be utilized as a reference for the investigation, 5. Services not explicitly described above are not included within the scope of this proposal. 6. MS staff will not enter upon adjacent private property with consent from the property owner. 7. MES assumes that all fieldwork will be performed during normal business hours Monday to Friday. If fieldwork is required during non-normal business hours, additional fees may be charged. FEE SCHEDULE Please refer to the included summary of staffing. SCHEDULE Based on finalization of our agreement and any options which may be authorized, a schedule for completion of the project will be developed and presented for your approval. Very truly yours, MFS Consulting Engineers & Surveyor, DPC S Scott Dey, CST Project Manager

File revisions (1)