Supporting Documentation · Aug 12, 2025
188-25 Exhibit A_GPI_WO Agreement Contract.pdf
c29566122c16f79c08f46bc0d8cb34308d36df25a00ca9218add6c33a8fad493Indexed text · page 58
Show all pagesExhibit C Page 57 of 66 TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange 105.05 of the NJDOT Standard Specifications for Roadway and Bridge Construction, 2019. We assume the Resident Engineer (RE) or Township will be responsible for the review and approval of catalog cuts as required under standard specifications and contract provisions. GP| assumes that up to five (5) shop drawing reviews will be necessary. GPI will respond to the Contractor’s or Township’s Requests for Information (RFI). We will document the RFI and provide a timely response (usually two (2) weeks or less unless otherwise agreed or specified) via e-mail, fax and/or letters as needed and provide a copy to all interested parties. GP! will visit the site as necessary to develop the proper response. For estimating purposes, we assume a total of eight (8) RFI inquiries. For purposes of this proposal, we have assumed there will be a need to prepare one (1) Plan Change for this project. We have included hours to conduct this work and will only charge these hours if the Change of Plan is needed and approved by the Township. This work will also include the development of Change of Plan construction cost estimate. It is assumed that GPI will attend up to one (1) field meeting to address general design and/or utility issues encountered in the field during construction. Final Acceptance (5170): The number of plan drawings that will require modifications to incorporate as-built mark-ups is not known at this time. For estimating purposes, we will assume as-built modifications will be indicated on no more than ten (10) of the total plan sheets provided in the construction plan set. We assume the level of effort will be routine and conducted within the current project scope and will not fall outside, or include an extension, of the existing project scope or limits. Cost Estimate — A copy of the proposed costs for the aforementioned services is attached. We would be happy to discuss this scope of services with you, at your convenience. Thank you for the opportunity to provide professional engineering services to the Township. Sincerely, Greenman-Pedersen, Inc. A Ge Andrew Cangiano, P| Director of Engineering -Morris Plains Office 301 Gibraltar Drive Suite 2A Morris Plains, NJ 07950 Phone: 973.434.8349 Email: acangiano@gpinet.com
File revisions (1)
- Sep 29, 2026
c29566122c1624,553,326 bytes