Supporting Documentation · Aug 12, 2025
188-25 Exhibit B_Executed Agreement-TAP_NJDOT_WO.pdf
75b23f9a6e5d2099e80bfdd60108e606ccfa13b93856c28f6d944ae859e76096Indexed text · page 41
Show all pagesTA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange e Hazardous waste investigations and studies, if necessary, are to be performed by NJDOT and therefore not included in this scope of services. e A Design Exception Report is not required and therefore preparation of the same is not included in this scope of services. © Modifications will not be required to the existing roadway profile or roadway cross slopes. Roadway improvements will be limited to the curb relocation and associated pavement repair strip. e As this is a Township led project, we do not anticipate the need to establish utility funding and therefore this activity is not included in this scope of services. ¢ Wayfinding is not included in the project scope. ¢ Driveway widths and locations will not be modified. e CADD drawings and design will be produced in AutoCAD C3D. Cost Estimate — A copy of the proposed costs for the aforementioned services is attached. We would be happy to discuss this scope of services with you, at your convenience. Thank you for the opportunity to provide professional engineering design services to the Township of West Orange. Sincerely, Greenman-Pedersen, Inc. LA BG Andrew Cangiano, PEYCME Director of Engineering -Morris Plains Office 301 Gibraltar Drive Suite 2A Morris Plains, NJ 07950 Phone: 973.434.8349 Email: acangiano@gpinet.com Page 8 of 8 GPI
File revisions (1)
- Sep 29, 2026
75b23f9a6e5d3,764,573 bytes