Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 12, 2025

188-25 Exhibit B_Executed Agreement-TAP_NJDOT_WO.pdf

Preserved file SHA-25675b23f9a6e5d2099e80bfdd60108e606ccfa13b93856c28f6d944ae859e76096

Indexed text · page 44

Show all pages
Page 44

FIXED FEE CALCULATION PROJECT: [Prebminary Engineering CONSULTANT: \Greenman-Pedersen, Inc. (GPI) |AGREEMENT OR CAM NO. PREPARED BY: [Andrew Cangiano DATE: 8113/2024) EVALUATE PROJECT SPECIFICS: Directions: teria i pased on its specifi ign Cost (or T for SIZE CON x Order Design Cost) for the SiZ: TY DURATION. & DEGREE CF R: Prime Consultant wil use Total Proj Each Subconsultant will assign poi Patching, Resurfacing, Restoration, Concept Development, Studies, Surveys, Landscape, Inspections SPECIFICS CRITERIA POINTS SIZE: SMALL - Total Fee (Project Design Cost) < $1,250,000 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 COMPLEXITY: SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, 10 15 Restoration, Concept Development, Studies, Surveys, Landscape, Inspections STANDARD - Moderate Scope; Rehabilitation, New, 15 or Reconstruction COMPLEX - Multi-disciplined, Highly Specialized, 20 or Major Unusual |DURATION: STANDARD - Appropriate Schedule 15 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 [DEGREE OF RISK: LEVEL 1 - Low Risk of Claims; Limited Scope of Work, Deck 20 30 LEVEL 2 - Average Risk of Claims; Standard Complexity 30 or Level 1 with High Public Exposure LEVEL 3 - High Risk of Claims; Hazardous, Experimental, 40 or Bonus/Penalty Clauses [TOTAL RATING = 75 CALCULATE FEE: PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.75 FEE FACTOR ( Project Specifics Factor x 0.30) = 0.225 DIRECT LABOR COSTS TOTAL FEE (Direct Labor Costs x Fee Factor) = $ _ 8,889.79 Fixed Fee Calculation Page 1 Revised 08/12/2015

File revisions (1)