Supporting Documentation · Aug 12, 2025
188-25 Exhibit B_Executed Agreement-TAP_NJDOT_WO.pdf
75b23f9a6e5d2099e80bfdd60108e606ccfa13b93856c28f6d944ae859e76096Indexed text · page 55
Show all pagesFIXED FEE CALCULATION PROJECT: (We St Comdor 2 CONSULTANT: MFS |AGREEMENT OR CAM NO. PREPARED BY: (Scott Dey DATE: 8/2/2024 EVALUATE PROJECT SPECIFICS: Design Cost (or Task Order Design Co: will use Total Proj ISK based on its specific project tasks Each Subconsuitart » ign pants for SIZE COMPLEXITY. DURATION. & DEGR: |SPECIFICS CRITERIA POINTS RATING SIZE: SMALL - Total Fee (Project Design Cost) < $1,250,000 15 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 |COMPLEXITY: SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, 10 410 Restoration, Concept Development, Studies, Surveys, Landscape, Inspections STANDARD - Moderate Scope; Rehabilitation, New, 15 or Reconstruction COMPLEX - Multi-disciplined, Highly Specialized, 20 or Major Unusual DURATION: STANDARD - Appropriate Schedule 15 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 DEGREE OF RISK: LEVEL 1 - Low Risk of Claims; Limited Scope of Work, Deck 20 20 Patching, Resurfacing, Restoration, Concept Development, Studies, Surveys, Landscape, Inspections LEVEL 2 - Average Risk of Claims; Standard Complexity 30 or Level 1 with High Public Exposure LEVEL 3 - High Risk of Claims; Hazardous, Experimental, 40 or Bonus/Penaity Clauses [TOTAL RATING = 60 CALCULATE FEE: IPROJECT SPECIFICS FACTOR (Total Rating /100) = 0.60 FEE FACTOR (Project Specifics Factor x 0.30) = 0.18 DIRECT LABOR COSTS TOTAL FEE (Direct Labor Costs x Fee Factor) = $ 2,616 Fixed Fee Calculation Page 1 Revised 08/12/2015
File revisions (1)
- Sep 29, 2026
75b23f9a6e5d3,764,573 bytes