Show all pagesTOWNSHIP OF WEST ORANGE 25 LAKESIDE AVENUE, WEST ORANGE, N.J. 07052 DEPARTMENT OF ENGINEERING SUSAN McCARTNEY Tel/Fax: (973) 325-4160 Mayor Email: Engineering@westorange.org ZAYIBETH CARBALLO Director/Municipal Engineer April 25, 2025 Mayor and Township Council Municipal Building 66 Main Street West Orange, New Jersey 07052 RE: WASHINGTON STREET CORRIDOR IMPROVEMENT PROJECT (PHASE 2 FEDERAL PROJECT NO. 0671301 STATE JOB NO.: 6122316 Mayor McCartney, Council President Krakoviak and Council Members: The Engineering Department desires to increase pedestrian safety, accessibility, and walkability along Washington Street Corridor. The Washington Street Corridor Improvement Project will improve Washington Street from Main Street to High Street. The proposed improvements will include improved crosswalks, signage, new widened sidewalks and curbs, ADA compliant curb ramps, detectable warning surfaces, flashing speed limit signs, flashing pedestrian crossing signs, enhanced lighting, street trees, and trash receptacles. These improvements are being made to promote walking and better accommodate pedestrian transit as an alternate travel mode. Deficient curb ramps, concrete driveway aprons and sidewalks will be replaced to conform with ADA requirements. Proposed improvements will be consistent with previously completed streetscape projects by the Township. On August 7, 2023, the Federal Highway Administration (FHWA) authorized funding up to an amount of $199,070.68 for the Washington Street Corridor Improvement Project — Phase I from Main Street to High Street. On September 5, 2023, Resolution 330-23 authorized the Mayor and Municipal Clerk to execute a Federal Aid Agreement with the NJDOT. A design contract was awarded to Greenman-Pedersen, Inc. of Morris Plains, NJ to perform these Preliminary Engineering activities for Phase I of the project. On October 22, 2024, the (FHWA) authorized funding up to an amount of $155,437.29 for the Washington Street Corridor Improvement, Phase II from High Street to the limits with the City of Orange. This authorization was based on the scope of work and budget agreed upon by the West Orange Township and the Division of Local Aid. The scope of work in this authorization includes Preliminary Engineering (PE) Activities. Final Design Activities will be authorized once the Preliminary Engineering activities have
sion of Local Aid. The scope of work in this authorization includes Preliminary Engineering (PE) Activities. Final Design Activities will be authorized once the Preliminary Engineering activities have been completed. AN EQUAL OPPORTUNITY EMPLOYER www.westorange.ore
File revisions (1)
- Sep 29, 2026
75b23f9a6e5d3,764,573 bytes