Freehold Road-Jackson Mills Road and Cedar Swamp Road Intersection Jackson, New Jersey PURPOSE OF CONTRACT Matrix New World Engineering (Matrix) has provided a comprehensive and environmentally-sensitive design for widening and intersection improvements at West Freehold Road – Jackson Mills Road (County Route 638) and Cedar Swamp Road (County Route 527). Matrix survey crew established horizontal and vertical control across the project site in the New Jersey Sate Plan Coordinate System (NAD83) and the North American vertical datum (NAVD 1988). A field traverse across the property was established utilizing the latest in both terrestrial and GPS surveying equipment. Topographic and roadway as-built surveys were performed utilizing aerial photography supplemented along with conventional methods. The right-of-way dedication plans were prepared to indicate land acquisition needed for roadway widening. The engineering scope included preparation of roadway improvement plans indicating realignment and widening of West Freehold Road, widening of Cedar Swamp Road, and reconstruction of the Jackson Mills Road and Cedar Swamp Road intersection. The project also included the design of the stormwater management system to meet water quality and stormwater quantity reduction requirements per NJDEP requirements. In addition, an Individual Permit under Freshwater Wetland Protection Act and Flood Hazard Area Control Act was obtained for proposed disturbance to wetlands/transition areas and vegetation disturbance within riparian buffer. MATRIX NEW WORLD ENGINEERING 973.240.1800 MATRIXNEWORLD.COM CLIENT County of Ocean 129 Hooper Avenue Toms River, NJ 08753 CONTACT John N. Ernst County Engineer 732-929-2130 SERVICES PROVIDED • Surveying • County Road Improvement Design Plan • Stormwater Management Design • Wetlands Permitting • Flood Hazard Permitting • Buffer Zone Permitting COST $2,500,000 DURATION 2013 - Ongoing KEY PERSONNEL Sean Savage, PE, LEED AP Nitin Nagrani, PE Robert Fiorile Donna McCormack

File revisions (1)