Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 8, 2025

203-25 Exhibit A.pdf

Preserved file SHA-2568e19d6b2dd0edef3c6978e7ddc4eea3a310e51b3a6c0438f1fc89eaf7c7ab6d1

Indexed text · page 25

Show all pages
Page 25

Raise Shorelines Citywide Priority Implementation Projects New York City, New York PURPOSE OF CONTRACT The New York City Economic Development Corporation (NYCEDC) on behalf of the Mayor’s Office of Recovery and Resiliency (ORR) is managing the Raise Shorelines Citywide Project to address vulnerability of NYC shorelines due to sea level rise. Funded through community development block grant funds for disaster recovery (CDBG-DR), the Raise Shorelines Citywide Study evaluated 600+ miles of NYC shorelines to pinpoint and prioritize locations in need of heightened coastal edges and/or reinforced shorelines. The program was developed to ensure that vulnerable coastal neighborhoods and infrastructure are prepared to withstand the impacts of climate change, specifically sea level rise impacts. As part of the study, priority sites were identified to address resiliency and readiness for long-term sea level rise through the implementation of strategic localized projects. NYCEDC is initially undertaking efforts at five priority sites located throughout the City: Mott Basin (Queens), Old Howard Beach (Queens), Travis Avenue (Staten Island), Edgemere (Queens), and East River Esplanade (Manhattan). In addition to providing sea level rise protection for socially vulnerable populations and their properties, the Raise Shorelines Citywide implementation Projects enhance community resiliency through the construction of walls, bulkheads, berms, and the raising and fortifying of existing infrastructure. Matrix New World Engineering (Matrix) provides regulatory, ecological, and surveying services for the priority implementation projects. Specific tasks include natural resource, topographic, property, utility, and bathymetric surveys; drainage analysis; and preparation of environmental review documents in accordance with City Environmental Quality Review (CEQR) law and regulations. CLIENT NYCEDC Prime Contractor: Stantec Consulting Services, Inc. 61 Commercial Street, Suite 100 Rochester, NY 14614 CONTACT Brigid Keating NYCEDC – Project Director 888-692-0100 Greg Sprich Stantec 212-366-5600 gsprich@stantec.com SERVICES PROVIDED • Natural Resource Survey • Topographic Survey • Property Survey • Utility Survey • Vault Survey • Bathymetric Survey • Drainage Analysis COST $419,150 DURATION 2017 - Ongoing KEY PERSONNEL Stephen Moncrief, Jr., PLS Robert Fiorile Donna

Page 25

Survey • Property Survey • Utility Survey • Vault Survey • Bathymetric Survey • Drainage Analysis COST $419,150 DURATION 2017 - Ongoing KEY PERSONNEL Stephen Moncrief, Jr., PLS Robert Fiorile Donna McCormack Brian Hobbs Rejina Sharma MATRIX NEW WORLD ENGINEERING 973.240.1800 MATRIXNEWORLD.COM

File revisions (1)