Supporting Documentation · Oct 28, 2025
237-25 Exhibit A - CME.pdf
9d278e83d59aca3151036fe09e4d138fbf49770339788435978a9224ef176c5dIndexed text · page 44
Show all pagesJAMES C. WATSON, PE, PTOE DIRECTOR OF TRANSPORTATION / TRAFFIC EDUCATION / CERTIFICATION: University of Vermont B.S. Civil Engineering 1993 New Jersey Professional Engineer License No. 24GE04452800 Professional Traffic Operations Engineer Institute of Transportation Engineers PROFESSIONAL AFFILIATIONS: • American Society of Civil Engineers • Institute of Transportation Engineers GENERAL DESCRIPTION OF EXPERIENCE: Mr. Watson has managed and designed various County and Municipal Transportation and Traffic Capital Improvement Projects including signalized and unsignalized intersections, full and partial roadway reconstructions, roadway resurfacing and rehabilitations, bridge and culvert replacements, bikeways, multi-use pathways, and ADA Accessible pedestrian facilities. Mr. Watson has managed and conducted numerous traffic studies and the development of conceptual design layouts necessary to effectively plan future County and Municipal Improvement projects. In addition, Mr. Watson has served many Municipal Planning Boards and Zoning Boards of Adjustment providing site plan and traffic study reviews along with expert traffic testimony related to the potential traffic impacts associated with proposed developments.. DETAILED EXPERIENCE: Parkway Avenue & Plainsboro Road Intersection Improvements, Plainsboro Township, New Jersey Project Manager for the design associated with the replacement of an existing traffic signal located within the Plainsboro Village Center in accordance with Plainsboro Township and NJDOT design standards, AASHTO and MUTCD. Raymond Avenue Bridge Reconstruction PL-20 Over Green Brook, City of Plainfield, Borough of North Plainfield and Borough of Watchung, Union County and Somerset County, New Jersey, Union County Project Project Manager for replacement of the Raymond Avenue Bridge over the Green Brook which included the design of a replacement bridge, drainage improvements and the approach roadways in accordance with Union County and NJDOT design standards, AASHTO and MUTCD. Route 9 and Main Street (CR 514) Roadway Improvements, Woodbridge Township, New Jersey Project Manager for the design associated with the replacement of two (2) NJDOT traffic signals, one (1) new Middlesex County traffic signal, the extension of an existing County culvert, Main Street widening and complete drainage system replacement within Woodbridge Township in
traffic signals, one (1) new Middlesex County traffic signal, the extension of an existing County culvert, Main Street widening and complete drainage system replacement within Woodbridge Township in accordance with NJDOT, Middlesex County and Woodbridge Township design standards, AASHTO. Developed comprehensive traffic control and staging plans and temporary traffic signal plans as per NJDOT standards and MUTCD. Intersection Improvements at Riva Avenue and Hardenburg Lane, East Brunswick Township, New Jersey Project Manager for the design associated with the replacement of an existing traffic signal in East Brunswick Township in accordance with East Brunswick Township and NJDOT design standards, AASHTO and MUTCD. New Dover Road and Colonia Boulevard Intersection Improvements, Woodbridge Township, New Jersey Project Manager for the design and traffic analyses associated with the Improvements to an existing unsignalized intersection in accordance with NJDOT design standards, AASHTO and MUTCD. Mullica Hill By-Pass, U.S. Route 322, Mullica Hill, New Jersey, Gloucester County Project Project Manager for the traffic related design tasks required to prepare final traffic signal design plans for this fast paced project which replaced an existing traffic signal in accordance with Gloucester County and NJDOT standards, AASHTO and MUTCD. Replacement of W. Century Road Bridge Over Sprout Brook, Borough of Paramus, Bergen County Project Manager for the traffic related design tasks associated with the development of Traffic Control Plans required to support multiple construction stages with Detour Plans in accordance with NJDOT, Bergen County and Paramus Borough design standards, AASHTO and MUTCD. Replacement of Magnolia Avenue Bridge, Borough of Montvale, Bergen County Project Manager for the traffic related design tasks associated with the development of Magnolia Avenue Full Bridge Closure Detour Plans in accordance with NJDOT, Bergen County and Montvale Borough design standards, AASHTO and MUTCD. EXPERIENCE: Planning Experience: 27 years
File revisions (1)
- Sep 29, 2026
9d278e83d59a21,827,962 bytes