Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 12, 2025

256-25 Proposal FPA - West Orange - MS4 Compliance.pdf

Preserved file SHA-256422bd5688af9cf4b5c2a6826ff36574b7aaa3c2fa54d8751c9e07dc4e5a45f17

Indexed text · page 17

Show all pages
Page 17

Project Profile Chester Township MS4 Mapping Chester Townsip, New Jersey In accordance with the New Jersey Department of Environmental Protection (NJDEP) New Jersey Pollution Discharge Elimination System (NJPDES) MS4 Tier A permit requirements, the maintenance and upkeep of stormwater management features is required. In order to comply with the MS4 permit requirements, an inventory of municipal stormwater systems must be completed. French & Parrello Associates (FPA) was retained and tasked with completing the inventory in compliance with NJDEP requirements which includes the locating and mapping of outfalls, ground water discharge points, interconnections, inlets, stormwater manholes, stormwater conveyance systems, pump stations, and other stormwater facilities. Utilizing ArcGIS Field maps in conjunction with web mapping applications deployed in ArcGIS Enterprise, 32.94 miles of conveyance, 1,491 inlets, 28 outfalls, 42 manholes, 210 groundwater discharge points, 5 stormwater basins, and 76 culverts were mapped for Chester Township. Client Chester Township Reference Robin Collins Clerk/Administrator 908.879.5100 ext 810 Services NJDEP MS4 Compliant Mapping GPS Data Collection Field Data Collection Inspection Services Web Mapping Application Development Asset Management

File revisions (1)