Supporting Documentation · Nov 12, 2025
256-25 Proposal FPA - West Orange - MS4 Compliance.pdf
422bd5688af9cf4b5c2a6826ff36574b7aaa3c2fa54d8751c9e07dc4e5a45f17Indexed text · page 22
Show all pagesProject Profile DRJTBC MS4 Stormwater Pollution Prevention Plan (PPP) Various Locations, New Jersey French & Parrello Associates (FPA) was retained by the Delaware River Joint Toll Bridge Commission (DRJTBC) to update their Stormwater Pollution Prevention Plan (SPPP). FPA conducted a thorough review of existing data and documents and provided recommendations to ensure compliance with the latest stormwater permit regulations. Site visits were carried out to verify current conditions and capture photo records of stormwater facilities. Additionally, FPA performed GIS mapping to assist in maintaining records. Utilizing the current NJDEP SPPP template, FPA identified the SPPP Team responsible for implementing various components of the plan. The updated SPPP includes: • A detailed description of the operation policies. • Comprehensive record-keeping documentation. • Implementation schedules aligned with permit requirements, including assistance with frequency. • A list of responsibilities and descriptions for stormwater compliance per NJDEP regulations. • Identified areas in need of attention and provided recommendations. Client DRJTBC Reference Kevin Skeels, PE Chief Engineer 267.394.6711 kskeels@drjtbc.org Services Stormwater Management GIS Mapping
File revisions (1)
- Sep 29, 2026
422bd5688af914,010,803 bytes