Show all pagesEric C. Betz, PE, BCEE, CME Director of Infrastructure Consulting Engineering Services, NJ Environmental Infrastructure Trust Fund (NJEIT) Pools 1, 2, and 3, NJEIT/NJ Department of Environmental Protection (NJDEP) Trenton, New Jersey Program Director responsible for consulting engineering contract that includes three distinct pools of consulting engineering and program management services. Pool #1 involves Redevelopment Project Set-Aside, SAIL Program, and Combined Sewer Overflow (CSO) Abatement Projects support. Pool #2 involves Green Infrastructure/Long Term Control Plans (LTCPs) and preparation of the Guidance Manual for the State of New Jersey. Pool #3 involves H2LOans Software application review. Supervised the preparation of the draft Guidance Document for Evaluating Green Infrastructure as a CSO Control Alternative for LTCPs, which has been submitted to the NJEIT/NJDEP for review and adoption. Emergency Storm Sewer Rehabilitation, New Jersey Department of Transportation (NJDOT) Emergency On-Call Infrastructure Repairs, IEW Construction Group Maple Shade, New Jersey Project Manager and Supervisor responsible for the design of point repairs along a deteriorated 54-inch diameter 15foot deep corrugated metal pipe (CMP) storm sewer aligned perpendicular to State Highway Route 73 South. Design incorporated repairs to pipeline directly adjacent to a commercial building. The project included the design of a pipeline rehabilitation procedure via slip-lining the entire 400-lf span of CMP storm sewer and new headwall system. Water and Sewer Improvements Program – Phase 2: Water Distribution and Sanitary Sewer Upgrades (Contract Nos. 1, 2 and 3) Keyport Borough, New Jersey Cont. No. 1: Principal-in- Charge responsible for the construction of water distribution and sanitary sewer improvements funded through the USDA-RD program. Water improvements included the installation of 3,200 linear feet (LF) of 8- inch diameter ductile iron pipe (DIP) water mains, 1,300 LF of copper water services, associated water system valves, and fire hydrants. Sanitary sewer improvements included repairs to the aging and deteriorated sewers, manholes, and service laterals, including closed-circuit television (CCTV) inspection and cleaning of approximately 5,500 LF of 6-inch to 8-inch diameter sewer main, cured-in-place (CIPP) lining of 3,000 LF of 6-inch to 8-inch diameter sewer
closed-circuit television (CCTV) inspection and cleaning of approximately 5,500 LF of 6-inch to 8-inch diameter sewer main, cured-in-place (CIPP) lining of 3,000 LF of 6-inch to 8-inch diameter sewer mainlines and associated air testing and grouting, sealing and rehabilitating sanitary sewer manholes, installation of 1,100 LF of 8-inch diameter PVC sewer main, 2,700 LF of 6-inch diameter PVC sewer laterals, and precast concrete manholes. Cont. No. 2: Design and construction administration for the replacement of all 2,500 residential and commercial meters within the service area, including the installation of infrastructure and networks required to remotely read and monitor the meters, and managed services to collect, store, and transmit meter readings. This project is funded through the USDA-RD program. Cont. No. 3: Responsible for the decommissioning and demolition of a 293,000-gallon riveted steel standpipe (c. 1896) and restoration of the site. Demolition work included existing water distribution piping, vaults, and associated electrical panels. The project was funded through the USDA-RD program. Historic Streetscape Improvements Allentown Borough, New Jersey Principal-in-Charge responsible for completion of the design of the streetscape and business district beautification project, which included new brick paver sidewalk improvements along Main Street/County Route 524/539 with new tree pits, decorative lighting, benches, trash receptacles, and bicycle racks. The project also included the design, grading, and layout of a new off-street municipal parking lot with retaining walls. Maintained close coordination with the Borough, Monmouth County Engineering Department, Freehold Soil Conservation District, NJDEP, the State Page 2
File revisions (1)
- Sep 29, 2026
422bd5688af914,010,803 bytes