Supporting Documentation · Nov 12, 2025
256-25 Proposal FPA - West Orange - MS4 Compliance.pdf
422bd5688af9cf4b5c2a6826ff36574b7aaa3c2fa54d8751c9e07dc4e5a45f17Indexed text · page 40
Show all pagesBrian T. Dougherty, PE, BCEE Senior Project Consultant / Manager of Water & Wastewater New Jersey American Water – Linden 36-inch PCCP Transmission Main Replacement Linden, New Jersey Project director for design, permitting, and construction management of 7,600 feet of 36-inch water transmission main to replace existing prestressed concrete cylinder pipe (PCCP) main in three phases. The project included easement acquisition, pipeline rehabilitation at two existing railroad crossings, and a new jack-and-bore crossing of a state highway. Project permitting included Conrail Pipeline Occupancy, NJDOT Utility Opening permit, local and county road opening permits, and soil erosion control permitting. Freehold Borough – Water Treatment Plant Borough of Freehold, New Jersey Project manager for the funding assistance, design, and permitting of a new 3.31 MGD water treatment plant, which treats water from six existing water supply wells for iron removal. The project included a new water treatment plant building, which will house a new pressure filtration system and chemical feed systems for sodium hypochlorite, lime, fluoride and polyphosphate. The plant also included a new backwash wastewater tank, supernatant recycle system and sludge pumping system. The project included coordination and planning documents for New Jersey Infrastructure Bank funding. Keyport Borough – Perry Street Water Treatment Plant Upgrades Keyport Borough, New Jersey Project principal for the funding assistance, design, permitting and construction of the upgrades of a 1.44 MGD multi- source treatment plant. The plant improvements include replacement of the existing gravity filters with two new horizontal pressure filters with automated valves and controls, replacement of existing aerator and clarifier with a new induced draft aerator, flocculation and settling basin, new calcium hypochlorite chemical feed system, upgrades to the existing lime, alum and polymer feed systems, three high lift service pumps, two backwash recycle pumps, new vertical turbine pumps for Well Nos. 7 and 8, a 450 kW emergency generator, and various nonprocess facility components. Prepared the United States Department of Agriculture Rural Development (USDARD) fund planning and design documents for the treatment plant upgrades and assisted the Borough for funding of the new generator and automatic transfer switch through
riculture Rural Development (USDARD) fund planning and design documents for the treatment plant upgrades and assisted the Borough for funding of the new generator and automatic transfer switch through FEMA’s Hazard Mitigation Grant Program. New Jersey American Water, 2023 Ocean City Sanitary Sewer Improvements Ocean City, New Jersey Project director for design, permitting, and construction management of 7,600 feet of 36-inch water transmission main to replace existing prestressed concrete cylinder pipe (PCCP) main in three phases. The project included easement acquisition, pipeline rehabilitation at two existing railroad crossings, and a new jack-and-bore crossing of a state highway. Project permitting included Conrail Pipeline Occupancy, NJDOT Utility Opening permit, local and county road opening permits, and soil erosion control permitting. Dudley Park Area Water Main Replacements, New Jersey American Water Camden County, New Jersey Project director for the design and permitting of approximately 9,000 feet of 8- and 12-inch water main replacements. Permitting efforts included county and local road opening permits. New Jersey American Water, Lumberton Water Main Replacements Burlington County, New Jersey Project director for design and permitting of 17,400 feet of 6”, 8”, and 12” water main replacements. Permitting consisted of NJDEP Safe Drinking Water and Burlington County Road Opening Permits. Page 3
File revisions (1)
- Sep 29, 2026
422bd5688af914,010,803 bytes